2023.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2023.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2023.05.11 Nesting Bird Survey for UC Berkeley Field Station Richmond, CA |
BioMaAS |
2023 |
Report |
2023.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2023.04.12 Review of Draft Soil Management Plan, Revision 3 |
DTSC |
2023 |
Agency Letter |
2023.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2023.03.03 Draft Soil Management Plan, Revision 3 |
Tetra Tech |
2023 |
Report |
2023.02.24. Final B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Approval Letter |
DTSC |
2023 |
Agency Letter |
2023.02.16. Final B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report |
Tetra Tech |
2023 |
Report |
2023.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2023.01.24 Notification of Piezometer DHR, Abandonment Approval Letter |
DTSC |
2023 |
Agency Letter |
2023.02.06 Approval of Corporation Yard, Triplicates Sample Results |
DTSC |
2023 |
Agency Letter |
2023.02.06 Corporation Yard, Triplicates Sample Results Revised Approval |
DTSC |
2023 |
Agency Letter |
2023.02.03 Approval of Corporation Yard: East Meadow and Building 120 Area |
DTSC |
2023 |
Agency Letter |
2023.02.03 Approval of Eastern Transition Area, Revised Proposed Sampling Letter |
DTSC |
2023 |
Agency Letter |
2023.01.27 Corporation Yard, Triplicates Sample Results, Revised |
Tetra Tech |
2023 |
Technical Letter |
2023.01.20 Notification of Piezometer DHR Abandonment, Revised |
Tetra Tech |
2023 |
Technical Letter |
2023.01.19 Corporation Yard: East Meadow and Building 120 Area, Revised |
Tetra Tech |
2023 |
Technical Letter |
2023.01.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2023.01.04 Review of Notification of Piezometer DHR Abandonment |
DTSC |
2023 |
Agency Letter |
2022.12.21 Eastern Transition Area, Revised Proposed Sampling |
Tetra Tech |
2022 |
Technical Letter |
2022.12.16 Notification of Piezometer DHR Abandonment |
Tetra Tech |
2022 |
Technical Letter |
2022.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.11.22 B118 Fire Wall SMP Form B |
UC Berkeley |
2022 |
Technical Letter |
2022.11.22 B118 Fire Wall SMP Form A |
UC Berkeley |
2022 |
Technical Letter |
2022.11.21 Review of Eastern Transition Area, Proposed Sampling |
DTSC |
2022 |
Agency Letter |
2022.11.17 Implementation of Soil Management Plan, Intercollegiate Athletics (IA) Throw Area |
Tetra Tech |
2022 |
Technical Letter |
2022.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.11.10 Review of Corporation Yard: East Meadow and Building 120 Area |
DTSC |
2022 |
Agency Letter |
2022.11.09 Review of Draft B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report |
DTSC |
2022 |
Agency Letter |
2022.10.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.10.12 IA Throw Area DTSC concurrence |
DTSC |
2022 |
Agency Letter |
2022.10.11 IA Throw Area Form A |
UC Berkeley |
2022 |
Technical Letter |
2022.10.11 IA Throw Area Form B and Sampling Plan |
Tetra Tech |
2022 |
Technical Letter |
2022.09.21 Eastern Transition Area, Proposed Sampling |
Tetra Tech |
2022 |
Technical Letter |
2022.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.08.24 Corporation Yard: East Meadow and Building 120 Area |
Tetra Tech |
2022 |
Technical Letter |
2022.08.22 Draft B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report |
Tetra Tech |
2022 |
Report |
2022.08.18 2021 Sampling Results Technical Memorandum Approval |
DTSC |
2022 |
Agency Letter |
2022.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.07.27 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples Approval |
DTSC |
2022 |
Agency Letter |
2022.07.25 Final EPA North Meadow PCB Cleanup and Removal Action Implementation DTSC Approval Letter |
DTSC |
2022 |
Agency Letter |
2022.07.23 Final EPA North Meadow PCB Cleanup and Removal Action Implementation Summary Report |
Tetra Tech |
2022 |
Report |
2022.07.23 Final EPA North Meadow PCB Cleanup and Removal Action Implementation Report Transmittal Letter |
UC Berkeley |
2022 |
Transmittal Letter |
2022.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.06.09 DTSC 5-Year Review Approval Letter |
DTSC |
2022 |
Technical Letter |
2022.06.06 Final 2021 RFS Groundwater Sampling Report |
Tetra Tech |
2022 |
Report |
2022.06.06 Final RFS 5-Year Review Report |
UC Berkeley |
2022 |
Report |
2022.05.23 Corporation Yard, Triplicates Sample Results |
Tetra Tech |
2022 |
Technical Letter |