Technical Documentation  
   

Following are regulatory and technical documents on investigations, remediation and monitoring data for the Richmond Field Station Remediation and Restoration Project. The project was initiated in 1999 by order of the California Regional Water Quality Control Board San Francisco Bay Region ("the Board"). The Board has oversight authority over San Francisco Bay toxic hot spots identified by investigations completed pursuant to the Bay Protection and Toxic Cleanup Program legislation.

In May 2005, the California Environmental Protection Agency announced that the state's Department of Toxic Substances Control (DTSC) would be the new lead regulatory oversight agency for remediation and wetlands restoration work at the RFS. UC Berkeley was issued a Site Investigation and Remediation order in September 2006.

Additional historic reports will be added in the future and as new documents become available.

Berkeley Global Campus Long Range Development Plan, EIR, and associated documents are now on the UC Berkeley Real Estate page at http://realestate.berkeley.edu/berkeley-global-campus-long-range-development-plan

 

 

Technical Documents beginning November 2008 posted most recent first
(Older documents are filed below in chronological order)

 
  August 10, 2017 TSCA PCB Risk-based Disposal Approval Application Corporation Yard and B150 Transformer Area Clean-up Sites [2.4 MB pdf file] and September 1, 2017 EPA approval letter [184 KB pdf file]  
     
  August 2, 2017 Supplemental PCB Sampling Results Corporation Yard Site, RFS [1,340 KB pdf file]  
     
  Draft Phase V Sampling Results Technical Memorandum Western Stege Marsh [3.6 MB pdf file]  
     
  May 24, 2017 DTSC approval letter [98 KB pdf file] of April 12, 2017 Sub-Slab Vapor Monitoring , B478 Berkeley Global Campus at Richmond Bay, Richmond Field Station Site, Terraphase [1,882 KB pdf file]  
     
  April 12, 2017 Soil Management Plan Revision 1 [6.9 MB pdf file]  
     
  March 24, 2017 Proposed Continued Groundwater Monitoring Locations for 2017 [428 KB pdf file]  
     
  March 6, 2017 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples January 18, 2017, Sampling Event, UC Berkeley EH&S [1.7 MB pdf file]  
     
  January 9, 2017 Final 2016 Groundwater Sampling Results Technical Memorandum [17.3 MB pdf file] and Cover Letter [56 MB pdf file]  
     
  January 5, 2017 Final Phase V Field Sampling Plan [47.7 MB pdf file] and Cover Letter [40 KB pdf file] and January 17, 2017 DTSC Approval Letter [995 KB PDF file]  
     
  December 14, 2016 Soils Management Plan Revision 1 DTSC Comment Letter [1.6 MB pdf file] and September 27 Draft SMP Revision 1 [3.3 MB pdf file] and Cover Letter [48 KB pdf file]  
     
  September 26, 2016 Draft 2016 Groundwater Sampling Results Technical Memorandum [15.4 MB pdf file] Tetra Tech  
     
 

July 18, 2016 Draft Field Sampling Plan Phase V [46 MB pdf] and cover letter [38 KB pdf file]

 
     
 

May 16, 2016 Final Phase IV Sampling Results Technical Memorandum no appendices [3,613 KB pdf file] and April 22, 2016 DTSC Comment Letter [413 KB pdf file]

Final Phase IV Sampling Results Memorandum with appendices [50.6 MB pdf file]

 
     
  March 30, 2016 Proposed Continued Groundwater Monitoring Locations for 2016 RFS Site [315 KB pdf file] and March 28, 2016 DTSC Approval Letter of March 21 Draft Letter [1,395 KB pdf file]  
     
  March 21, 2016 Proposed Groundwater Monitoring Locations fro 2016 RFS Site [337 KB pdf file]  
     
  February 5, 2016 Building 280A and B450 Soil Sampling Results [2.3MB pdf file] and DTSC approval letter [937 KB pdf file]  
     
  December 11, 2015 Final Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickle Technical Memorandum [1,358 KB pdf file] and DTSC Approval Letter [1,740 KB pdf file]  
     
  October 19, 2015, Final 2015 Groundwater Sampling Results Technical Memorandum [16.3 MB pdf file] and 11/3/2015 DTSC Approval Letter [1065 KB pdf file]  
     
  October 6, 2015 Phase IV, EPA Meadow North, Supplementary PCB Sampling Results [1,447 KB pdf file]  
     
  July 24, 2015 Draft Groundwater Sampling Results Technical Memorandum [25.2 MB pdf file] and September 25, 2015 DTSC review letter [1.1 MB pdf file]  
     
  August 12, 2015 Removal Action Workplan, Corporation Yard Soil Removal Action Final Construction Drawings [2.5 MB pdf file] and Specifications [1.061 KB pdf file], and Cover Letter to DTSC [58 KB pdf file].  
     
  July 24, 2015 Draft 2015 Groundwater Sampling Results Technical Memorandum [25.2 MB pdf file] and Cover Letter [39 KB pdf file]  
     
  June 5, 2015 Draft Phase IV Sampling Results Technical Memorandum [8,676 KB pdf file]  and Cover Letter [30 KB pdf file]. August 7, 2015 DTSC Comment Letter [7,477 KB pdf file]  
     
  June 1, 2015 Request for Reuse of FSP IV Soil On Site [3,168 KB pdf file] and August 14, 2015 DTSC Approval Letter [255 KB pdf file]  
     
  April 9, 2015 2014 Groundwater Sampling Results Vicinity of the Biologically Active Permeable Barrier University of California, Berkeley Global Campus and July 9, 2015 DTSC approval letter [658 KB pdf file]  
     
  February 20, 2015 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site, Tetratech [1,3 MB pdf file]  
     
  December 8, 2014 GSU Report on Completion of a Magnetometer Survey at he University of California (UC) Richmond Field Station, Richmond, CA, DTSC [560 KB pdf file]  
     
  November 24, 2014 Final 2014 Groundwater Sampling Results Technical Memorandum, Tetratech [10.1 MB pdf file] and DTSC approval letter [477 KB pdf file]  
     
  October 28, 2014 Final Field Sampling Plan Phase IV Addendum Tetratech with Cabrera work plan for Bulb Exploratory Excavation [13.2 MB pdf file] and DTSC approval letter [528 KB pdf file}  
     
  October 22, 2014 DTSC comment letter to Draft Phase IV Field Sampling Plan Addendum 1 including the results of the September 30, 2014 magnetometer re-survey by DTSC [6,858 KB pdf file]  
     
  October 10, 2014 B280 and B450 Soil Sampling Plan Letter [389 KB pdf file] and October 20, 2014 DTSC approval [60 KB pdf file]  
     
  October 6, 2014 Field Sampling Plan- Phase IV Tetratech [17.4 MB pdf file] and DTSC approval letter [226 KB pdf file]  
     
  September 18, 2014  Response to Department of Toxic Substances Control Comments Regarding the “Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, University of California, Richmond Field Station, Terraphase [7.7 MB pdf file]  
     
  July 18, 2014 Final Removal Action Workplan Richmond Bay Campus, Research, Education, and Support Area and Groundwater Within the Former Richmond Field Station Site Tetratech [29.5 MB pdf file} and July 18, 2014 DTSC approval letter [292 KB pdf file]  
     
  April 24, 2014 Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, UC Berkeley RFS, Terraphase [6.5 MB pdf file]  
     
  November 25, 2013 Public Draft Removal Action Workplan Richmond Bay Campus, Research, Education, and Support Area and Groundwater within the Former Richmond Field Station Site, Tetra Tech[36 MB pdf file], DTSC Community Notice Fact Sheet on the RAW [8225 KB pdf}, and DTSC Public Notice [335 KB pdf]  
     
  October 11, 2013 Final Monitoring Well Installation Work Plan, Vicinity of the Biologically Active Permeable Barrier, UC RFS, Terraphase [529 kb pdf file] and October 16, 2013 DTSC Approval Letter of the BAPB Workplan [127 kb pdf file}  
     
  October 10, 2013 Final 2013 Groundwater Sampling Results Technical Memorandum, Tetra Tech [11.3 MB pdf file] and October 31, 2013 DTSC approval letter [53 kb pdf file]  
     
  May 28, 2013 Final Site Characterization Report [68.5 MB pdf file] and May 2, 2013 DTSC SCR approval letter [99 KB pdf file]  
     
  March 5, 2013 Notification of Piezometer Abandonment and Installation, and Scope of Work [366 kB pdf file] and March 8, 2013 DTSC Approval Letter [213 kB pdf file]  
     
  February 14, 2013 DTSC comments on January 9, 2013 Draft Site Characterization Report, Proposed Richmond Bay Campus [415 KB psf file]  
     
  Februay 1, 2013  Technical Approach for Human Health Risk Assessment  [1.48 MB pdf file]  
     
  December 18, 2012 Draft Groundwater Investigation Within and in the Vicinity of the BAPB at the Unviersity of California Richmond Field Station, Terraphase[11.5 MB pdf file] and May 20, 2013 DTSC approval letter [309 KB pdf file]  
     
  December 12, 2012 Final Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum Tetratech [19.9 MB pdf file] and December 4, 2012 DTSC Approval Letter [67 kB pdf file]  
     
  November 16, 2012 Revised Soil Gas Sampling Results, Campus Bay and University of California RFS Property Boundary, terraphase engineering [1.4 MB pdf file]  
     
  September 10, 2012 Pilot Study Summary Report for In Situ Treatment of Volatile Organic Compounds in Groundwater, 2011 Injectinos, Lot 1, Former Zeneca Faciltiy, Campus Bay Project ARCADIS [21.4 MB pdf file]  
     
  August 10, 2012 Final Phase III Field Sampling Plan, Tetratech [23.6 MB pdf file]  
     
  August 3, 2012 Phase III Field SAmpling Plan Response to DTSC June 22, 2012 Comments [34 KB pdf document]  
     
  August 3, 2012 DTSC Approval of Field Sampling Workplan Phase III With Revisions [97 KB pdf document]  
     
  July 19, 2012 Revised TCE Risk Evaluation terraphase engineering [12.8 MB pdf file] and October 4, 2012 DTSC Approval letter [46 kB pdf file]  
     
  July 5, 2012 DTSC approval letter of June 11, 2012 Final Technical Memorandum for Well Closures [ 58 KB pdf file]  
     
  June 22, 2012 DTSC Comment Letter on May 31, 2012 Draft Phase III Field Sampling Plan [746 KB pdf file]  
     
  June 11, 2012 Final Phase II Sampling Results Technical Memorandum (including responses to March 14, 2012 DTSC comments) Tetratech [3 MB pdf file]  
     
  June 11, 2012 Final Technical Memorandum for Well Closures, Tetratech [48 MB pdf file]  
     
  April 26, 2012 Phase II Sampling Results Technical Memorandum Draft Response to Comments to DTSC March 14, 2012 Comment Letter [21 KB pdf file]  
     
  March 23, 2012 DTSC approval of January 20, 2012 Tetratech Technical Memorandum for Well Closures [148 KB pdf file]  
     
  March 20, 2012 DTSC Approval of Terraphase March 8, 2012 "Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB at the RFS" [50 kb pdf file]  
     
  March 16, 2012 Proposed Continued Groundwater Monitoring April 2012, Tetratech [34 kb pdf file]  
     
  March 15, 2012 DTSC Approval of 2/29/12 Final Phase 1 October 2011 Groundwater Sampling Results Technical Memorandum [44 KB pdf file]  
     
  March 14, 2012 DTSC Comment Letter on 1/20/12 Phase II Sampling Results Technical Memorandum [679 KB pdf file]  
     
  March 8, 2012 Response to DTSC Comments Regarding the "Field Sampling Work Plan to conduct additional groundwater investigations within tand in the vicinity of the BAPB at the RFS" [Terraphase, 1.11 MB pdf file]  
     
  March 6, 2012 Wetland Determination, Western Stege Marsh [Tetratech 3.1 MB pdf file]  
     
  Februry 29, 2012 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum [Tetratech, 1.98 MB pdf file]  
     
  February 22, 2012 DTSC Comments to February 1, 2012 Terraphase report Field Sampling Paln to conduct adidtional groundwater investigations within and in the vicinity of the BAPB [151 KB pdf file]  
     
  February 10, 2012 DTSC Approval of 2/1/12 Final Revision 1 Phase 1 Groundwater Sampilng Results Technical Memorandum [42 kb pdf file]  
     
  February 7, 2012 DTSC Comments on 1/10/12 Draft Phase 1 October 2011 Groundwater Sampling Technical Memorandum [309 KB pdf file]  
     
  February 1, 2012 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB at the University of California RFS [Terraphase 680 KB pdf file]  
     
  Feburary 1, 2012 Final Phase 1 April 2011 Groundwater Sampling Results Technical Memorandum [Tetratech, 11.2 MB pdf file] "FSW Phase 1 Round 2"  
     
  January 20, 2012 Draft Phase II Sampling Results Technical Memorandum [Tetratech, 2.16 MB pdf file]  
     
  January 20, 2012 Draft Technical Memorandum for Well Closures, Tetratech [47 MB pdf file]  
     
  January 19, 2012 DTSC Comments on 11/30/11 Terraphas Soil Gas Sampling Results, Campus Bay and UC RFS Property Boundary [204 kb pdf file]  
     
  January 11, 2012 DTSC Comments on December 9, 2011 Final Phase 1 April Groundwater Sampling Results Technical Memorandum [62 KB PDF file]  
     
  December 9, 2011 Final Phase I April 2011 Groundwater Sampling Results Technical Memorandum Tetratech [5.5 MB pdf file]  "Phase I Round 2" wet weather results  
     
  December 2, 2011 DTSC comments on 11/18/2011 Terraphase Technical Memorandum for the UC RFS BAPB Groundwater Sampling Results [424 KB pdf file]  
     
  November 30, 2011 Soil Gas Sampling Results, Campus Bay and University of California RFS Property Boundary terraphase [1.744 MB pdf file]  
     
  November 18, 2011 UC RFS BAPB Groundwater Sampling Results [Terraphase 2.1 MB pdf file]  
     
  November 16, 2011 DTSC Approval of August 22, 2011 Final (Revision 2) Phase 1 Groundwater Sampling Results Technical Memorandum [257 kB pdf file]  
     
  October 5, 2011 DTSC Approval of September 12, 2011 Final Phase II Field Sampling Plan [178 kb] pdf file]  
     
  September 22, 2011 DTSC Work Notice of Soil Gas Investigation September 28 to October 14, 2011 [83 kB pdf file]  
     
  September 12, 2011 DTSC Approval of August 31, 2011 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and th University of California Richmond Field Station Property Border, Richmond California. August 31, 2011 [273 kB pdf file]  
     
  September 12, 2011 DTSC Approval of 8/19/2011 Final Technical Memorandum for Well Destructions [226 kB pdf file]  
     
  September 12, 2011 Final Phase II Field Sampling Plan, Tetratech [3.2 MB pdf file]  
     
 

August 31, 2011 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and the University of California Richmond Field Station Property Border, Richmond California. August 31, 2011 Terraphase [3 MB pdf file]

 
     
  August 22, 2011 Final (Revision 1) Phase 1 Groundwater Sampling Results Technical Memeorandum Tetratech[667 KB pdf file]  
     
  August 19, 2011 Technical Memorandum for Well Destructions, Richmond Field Station [2.8 MB pdf file] and August 30, 2011 Response to Comments [30 kB pdf file]  
     
  July 21, 2011 DTSC Comment Letter on May 11, 2011 Final Phase 1 Groundwater SAmpling Results Technical Memorandum DTSC [299 KB pdf file]  
     
  May 11, 2011 Final Phase I Groundwater Sampling Results Technical
Memorandum
, Tetratech EM Inc. [33.7 MB pdf file]
 
     
  March 29, 2011 DTSC Approval Letter of March 25, 2011 Proposed Continued Groundwater Monitoring Locations [222 KB pdf file]  
     
  March 25, 2011 Proposed Continued Groundwater Monitoring Locations [769 KB pdf file] Tetratech  
     
  March 11, 2011 Transmittal of Groundwater Data Colected in Select Areas at the University of California Richmond Field Station [ARCADIS 3.1 MB pdf file]  
     
 

January 12, 2011 Draft Phase I Groundwater Sampling Results Technical Memorandum [26.5MB pdf file] Tetratech

 
     
  November 24, 2010 Revised Letter Wrok Plan to Evaluate Groundwater in Select Areas at the University of California RFS [ARCADIS, 904 KB pdf file]  
     
  June 2, 2010 Final Phase 1 Groundwater Investigation Field Sampling Workplan [6.6 MB pdf file] Tetratech  
     
  June 2, 2010 Final Phase 1 Groundwater Investigation Field Sampling Workplan Health and Safety Plan [1.9 MB pdf file] Tetratech  
     
  June 2, 2010 Final Phase 1 Groundwater Investigation Field Sampling Workplan Quality Assurance Project Plan [2.1 MB pdf file] Tetratech  
     
  June 2, 2010 Final FSW Groundwater Sampling Locations Map [320 kB pdf file] Tetratech  
     
  May 26, 1010 DTSC Approval Letter for April 15, 2010 Phase 1 Groundwater Investigation FIeld Sampling Workplan [978 kB pdf file]  
     
  April 15, 2010 Phase 1 Groundwater Investigation FIeld Sampling Workplan [7.2 MB pdf file] Tetratech  
     
  April 15, 2010 Phase 1 Groundwater Investigation FIeld Sampling Workplan Appendix A Quality Assurance Project Plan [2.1 MB pdf file] Tetratech  
     
  April 15, 2010 Phase 1 Groundwater Investigation FIeld Sampling Workplan Appendix B Health and Safety Plan [1.9 MBpdf file] Tetratech  
     
  December 2009 Western Stege Marsh Restoration Project Vegeation Monitoirng Report- 2009 May & Associates [11.4 MB pdf file]  
     
  December 23, 2009 Geotechnical Memorandum- Hydrogen Fuel Sation Limited Geotechnical Investigation [1.96 MB pdf file] Nichols Consulting Engineering  
     
  December 17, 2009 DTSC Notice of Public Comment Period Time Critical Removal Action Zeneca/Former Stauffer Chemical Site [47 KB PDF file] for soil stockpile removal and grading  
     
  December 7, 2009 DTSC Meade By-Pass Approval of November 2, 2009 Report, Letter to City of Richmond [50 kb pdf file]  
     
  November 2, 2009 Results of Evaluation Pre-Construction Conditions in Soil Meade Street Bypass Richmond CA [7.5 MB pdf file] PES Environmental Inc., prepared for the City of Richmond  
     
  August 12, 2009 Year 4 Monitoring Report for the Western Stege Marsh Restoration Project [23 MB pdf file]  
     
  July 2009, DTSC Work Notice Temporary Meade By-Pass Roadway Richmond, Caliornia Evaluation of Pre-Construction Conditions Starting July 2009 [253 KB pdf file]  
     
  June 22, 2009, Workplan for Evaluation of Pre-Construction Conditions in Soil Meade By-Pass Roadway Richmond, California PES Environmental [ 2.2 MB pdf file]  
     
  June 5, 2009 DTSC/Zeneca/UC Consent Agreement Regarding June 2007 SOVs [1.2 MB Word file]  
     
  May 29, 2009 DTSC Approval Letter for the May 26 Final Implementation Summary Report of a Time-Critical Removal Action at Two Subareas in the Western Transition Area [51 KB pdf file]  
     
 

May 26, 2009 Final Implementation Summary Report for a Time-Critical Removal Aciton at Two Subareas in the Western Transistion Area, Tetratech [ 42.4 MB pdf file]

 
     
  May 26, 2009 Sampling Results for March 2, 2009 Stormwater within the Western Stege Marsh, Tetratech [19.8 MB pdf file]  
     
  April 23, 2009 DTSC comment letter on the February 23, 2009 Draft Implementation Summary Report for a Time Critical Removal Action at Two Campfire Locations in the Western Transistion Area [40KB pdf file]  
     
  April 15, 2009 DTSC comment letter on the February 27, 2009 Draft Field Sampling Workplan [1.2 MB pdf file]  
     
 

March 19, 2009 Year 3 Monitoring Report for the Western Stege Marsh Restoration Project [40.6MB pdf file]

March 19, 2009 Submission Cover Letter [ 261 KB pdf file]

 
     
 

February 27, 2009 Draft Field Sampling Workplan [20.3 MB pdf file]

Cover letter [1 MB pdf file]
Health and Safety Plan Appendix [ 25.1 MB pdf file]
Quality Assurance Project Plan Appendix [13.5 MB pdf file]

 
     
  February 23, 2009 Draft Implementation Summary Report for a Time Critical Removal Action at Two Campfire Locations in the Western Transistion Area [19.6 MB pdf file]  
     
  December 28, 2008 DTSC approval letter for the Current Conditions Report [227 KB pdf file]  
     
 

November 21, 2008 Final Current Conditions Report (CCR)

Due to the size of this document, it has been split into five pdfs: 1) Text and tables, 2) figures, 3) Appendices A, B, D, E, F, G, H, I, K, & L, 4) Appendix C, and, 5) Appendix J

 
       
   

Final CCR Text and Tables (4.4 MB pdf file)

Final CCR Figures (49.4 MB pdf file)

Final CCR Appendices A, B, D, E, F, G, H, I, K, & L (36.1 MB pdf file)

Final CCR Appendix C - Photographs (13.6 MB pdf file)

Final CCR Appendix J- Hydrogeologic Summary Report (27.2 MB pdf file)

Final CCR Submittal Cover Letter (432 KB pdf file)

 
     
     
     
Regulatory Documents (Permits, Orders, Agreements, etc.)  
   
DTSC ORDER RICHMOND FIELD STATION  
  September 15, 2006 State of California Department of Toxic Substances Control Site Investigation and Remediation Order, Docket No. I/SE-RAO 0607-004 (3,051 KB pdf file)  
   
DTSC ORDER ZENECA SITE  
  September 15, 2006 State of California Department of Toxic Substances Control Site Investigation and Remediation Order, Docket No. I/SE-RAO 0607-004 (1,415 KB pdf file)  
   
BOARD ORDER:  
  October 2001 California Regional Water Quality Control Board San Francisco Bay Region Order No. 01-102 Site Cleanup Requirements for: University of California Berkeley Zeneca Inc. Meade Street Operable Unit Subunit 2 [157 KB doc file]  
     
  March 19 2002 RWQCB Water Quality Certification for Cleanup Activities Required by SCRs 01-101 and 01-102 [383 kb pdf file]  
   
ARMY CORPS OF ENGINEERS PERMIT:  
  June 2003 Nationwide Permit 38 Modification Request (ACOE File No. 25417S) Western Stege Marsh Remediation and Restoration Project at Richmond Field Station US Army Corpos of Engineers, Regulatory Branch, BBL [24 MB pdf file] and June 27, 2003 Summary Letter to USACE and USFWS [826 KB pdf file]  
     
  July 2003 Biological Assessment Report [7 MB p df file] and transmittal letter to USACE and USFWS [28 KB pdf file]  
     
  September 4, 2003 Department of the Army, Corps of Engineers, File Number 28135S- Western Stege Marsh Remediation and Restoration (Army Nationwide Permit 38 Authorization [7,553 KB pdf file]  
   
BCDC PERMIT:  
  January 2015 BCDC Permit Revision Number 3 [833 KB pdf] and cover letter [142 KB pdf]  
     
  June 2003 Revision to Permit No. M01-52 Western Stege Marsh Remediation and Restortation Project, Richmond, California San Francisco Bay Conservation and Development Commission BBL [33MB pdf file]  
     
  July 24, 2003 Additional Information Requested to Complete Revision to Permit No. M01-51 for the UC Berkeley RFS Remediation Project at Stege Marsh BBL [9.96MB pdf file]  
     
  October 17, 2003 Bay Conservation and Development Commission Permit No. M01-52(b) Amendment No. One [178 KB pdf file]  
   
  June 18, 2004 Bay Conservation and Development Commission Permit No. M01-52(b) Amendment No. Two Extension [ 19 KB pdf file]  
   
CEQA Documenation  
Note: the RFS Remediation Project Initial Study California Environmental Quality Act is split into three separate pdfs. below  
  May 28, 2003 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act Text, Table and Appendices [34.5 MB pdf file]  
     
  May 28, 2003 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act Figures [3.8 MB pdf file]  
     
  May 28, 2003 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act List of Preparers [90 KB pdf file]  
     
  July 16, 2003 Project and Environmental Approval for the Richmond Field Station Remediation Project [5.3 MB pdf file]  
     
  July 16, 2003 Project and Environmental Approval for the Richmond Field Station Remediation Project figure [252 KB pdf file]  
   
Human Health and Ecological Risk Assessment Reports  
  April 11, 2014 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 27, 2014 Sampling Event [2.7 MB pdf file]  
     
  March 1, 2013 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 4, 2013 Sampling Event [3.2 MB pdf file]  
     
  June 1, 2009 DTSC Risk Assesssment for Coastal Cleanup Volunteer in the Meeker Slough Area [484 KB pdf file]  
     
  November 2001 Human Health and Ecological Tiered Risk Evaluation, University of California, Berkeley, Richmond Field Station/Stege Marsh, URS [ 31MB pdf file]  
   
  November 1, 2002 Response to Comments on Human Health and Ecological Risk Assessment, letter to RWQCB [ 3,282 KB pdf file]  
   
 

Provisional Joint Health Statement Summary, The Zeneca and UC Richmond Field Station Sites, Contra Costa County Health Services Department and California Department of Health Services

 
     
   

January 18, 2006 Revision

Full Statement [160 KB pdf file]

Short Statement [132 KB pdf file]

 
       
   

June 23, 2005

Full Statement [18 KB pdf file]

Short Statement [15 KB pdf file]

 
       
  August 15, 2007 Draft Pulbic Health Statement Evaluation of Exposure to Contaminants at the University of California, Berkeley, Richmond Field Station California Department of Public Heatlh [ 3.9 MB pdf file]  
     
  September 5, 2007 Results of a Draft Public Health Evaluation about Contaminants at the UC Richmond Field Station Contra Costa County Health Services Department two page summary [113 KB pdf file]  
     
  September 27, 2007 Draft Public Health Assessment - UC Comments [1.01 MB pdf file]  
     
 

March 13, 2008 ATSDR Public Health Assessment Evaluation of Exposure to Contaminants at the University of California, Berkeley, Richmond Field Station [3.7 MB pdf file]

March 17, 2010 Revised Final PHA [4.3 MB pdf file]

 
     
  July 28, 2008 ATSDR Evaluation of Exposure to Contaminants from the Zeneca/Campus Bay Site [6.9 MB pdf file]  
     
  March 16, 2009 ATSDR Public Health Assessment Evaluation of Exposure to Contaminants at the Zeneca/Campus Bay Site [5.2 MB pdf file]  
     
   
Back to top   
   
Investigation and Cleanup Plans and Reports  
  August 1989 Environmental Assessment of University of California Richmond Field Station Richmond, CA ensco environemental services [218 kB pdf file] Note: This document was scanned upside-down. To view right-side up go to View and rotate the document twice in either direction.  
     
  April 6, 1990 Environmental Assessment for the Proposed EPA Region 9 Laboratory at the University of California's Richmond Field Station, Jones & Stokes Associates [2 MB pdf file]  
     
 

March 22, 1990 Preliminary Investigation of Mercury in Soil and Groundwater at Former Mercury Fluminate Facility Jonas & Associates [3.7 MB pdf file] and March 27, 1990 letter to DHS [40 KB pdf file}

 
     
 

May 21, 1990 Removal Site Evaluation of Mercury in Soil and Groundwater at Former Mercury Fulminate Facility Richmond Field Station May 21, 1990 Jonas & Associates [31 MB pdf file]  Note: This document was scanned upside-down. To view right-side up go to View and rotate the document twice in either direction.

 
     
  May 21, 1990 DRAFT Environmental Soil Sampling and Analysis Plan for Construction of EPA Laboratory at the University of California Richmond Field Station Richmond, California May 21, 1990, Jonas & Associates [35 MB pdf file]  
     
  February 22, 1991 Preliminary Risk Assessment University of California Richmond Field Station, Jonas & Associates [23 MB pdf file]  
     
  March 21, 1991 US EPA letter to UC Berkeley regarding RFS site conditions and risk posed to workers in planned Region IX laboratory [893 KB pdf file]  
     
  December 10, 1999 University of California, Berkeley Richmond Field Station, Field Sampling and Analysis Plan and Tiered Risk Evaluation, URS [24 MB pdf file]  
     
  December 2000, Field Sampling and Analyses Results University of California, Berkeley Richmond Field Station/ Stege Marsh, URS [33 MB pdf file]
 
   
 

November 21, 2001 Results of Additional Soil and Groundwater Investigations and Groundwater Monitoring Plan, Upland Portion of Subunit 2A, Richmond Field Station (Tasks 2A and 2B RWQCB Order No. 01-102)

Volume 1 Text, Figures Tables [6.6 MB pdf file]

Volume 2 QC and Laboratory Analytical [21 MB pdf file]

 
   
  November 21, 2001 Results of Additional Soil and Groundwater Investigations and Surface Water Monitoring Plan, MarshPortion of Subunit 2A, Richmond Field Station (Tasks 3A and 3B RWQCB Order No. 01-102) [6.1 MB pdf file]  
   
  February 28, 2002 Workplan for Additional Soil and Groundwater Investigation Upland Portion of Subunit 2B Richmond Field Station (Tasks 4A, RWQCB Order No. 01-102) [4 MB pdf file]  
   
  February 28, 2002 Workplan for Additional Sediment and Surface Water Sampling Marsh Portion of Subunit 2B (Task 5A RWQCB Order No. 01-102) [5MB pdf file]  
   
  PHASE 1: August 16, 2002 Remedial Design Details- Addendum Subunit 2A Meade Street Operable Unit Richmond Field Station, Richmond, California (Tasks 2D and 3D, RWQCB Order No.01-102), URS Corporation [4 MB pdf file]
 
   
  October 31, 2002 Results of Additional Soil and Groundwater Investigations Upland Portion of Subunit 2B Richmond Field Station (Task 4B RWQCB Order No. 01-102) [14 MB pdf file]  
   
  PHASE 1: November 6, 2002 Remedial Design Details- Addendum 2 Mercury Treatability Study Subunit 2A Meade Street Operable Unit Richmond Field Station, Richmond, California (Tasks 2D and 3D, RWQCB Order No.01-102), URS Corporation [921 KB pdf file]
 
     
  December 17, 2002 Conceptual Remedial Action Plan Marsh Portion of Subunit 2B, Richmond Field Station, Richmond California (Tasks 5B, RWQCB Order No. 01-102) [ 28 MB pdf file]  
   
  PHASE 1: September 4, 2003 Implementation Report, Phase 1, Subunit 2A Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Tasks 2E and 3E, RWQCB Order No.01-102), URS Corporation [148 MB pdf file]
 
     
  October 20, 2003 Supplemental Mercury Treatability Study Subunit 2A Meade Street Operable Unit URS [1.27 MB pdf file]  
   
  PHASE 2: April 15, 2003 Remedial Action Plan Phase 2 Subunits 2A and 2B Marsh, Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Task 5C, RWQCB Order No.01-102) [10 MB pdf file]
 
   
  PHASE 2: December 3, 2004 Implementation Report Phase 2 – Subunit 2A & 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Tasks 2E, 3E and 5D, RWQCB Order No.01-102) [19 MB pdf file]
 
     
  August 28, 2004 PCBs in AOC U1 BBL [640 KB pdf file]  
   
  PHASE 3: July 13, 2004 Remedial Action Plan- Phase 3 Upland Portion of Subunit 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Tasks 4B and 4C, RWQCB Order No.01-102), BB: [9 MB pdf file]
 
   
  PHASE 3: June 16, 2005 Implementation Report Phase 3 Upland Portion of Subunit 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Task 4D, RWQCB Order No.01-102) [63 MB pdf file]
 
   
  FUTURE PHASES: June 3, 2005 Draft Technical Report Conceptual Remedial Action Plan – Addendum Marsh Portion of Subunit 2B Richmond Field Station University of California Berkeley Richmond, California, BBL [42 MB pdf file] Appendix A Boring Logs Bulb [117 KB pdf file]
 
     
  June 21, 2005 Purple Ooze Photos

August 19, 2005 DTSC Report on "Purple Ooze
"
 
     
  July 8, 2005 Summary of PCB Results, Richmond Field Station, BBL [14.4 MB pdf file]  
     
  December 8, 2005 Revised Technical Specifications for Well Destructions University of California Berkeley - Richmond Field Station [8.1 MB pdf file]  
     
  March 8, 2006 Well Closure Documentation Report University of California Berkeley - Richmond Field Station, Stellar Environmental [19 MB pdf file]  
     
  September 27, 2006 RFS Project Coordinator Letter [698 kb pdf file] and Project Engineer Letter [640 kB pdf file]  
     
     
     
  October 31, 2 006 Health and Safety Plan Addendum, University of California, Berkeley Richmond Field Station, Richmond California, Tetratech EM Inc. [1.0 MB  
     
  November 2,, 2006 Field Implementation Plan for Surface Water, Stormwater and Sediment Monitoring, University of California, Berkeley Richmond Field Station, Richmond California, Tetratech EM Inc. [1.0 MB pdf file]  
     
  December 18, 2006 Surface Water, Sediment and Stormwater Monitoring Report University of California Richmond Field Station TETRATECH EMI [3,046 KB pdf file]  
   
 

April 5, 2007 Current Conditions Report (CCR) University of California Richmond Field Station TETRATECH EMI Due to the large l108 MB pdf file]

Due to the large size of this document has also been split and is available in the following two sections:

CCR Text, Figures and Tables [19 MB pdf file]

CCR Appendixes [33 MB pdf file]

 
     
  July 23, 2007 Background Concentrations of Arsenic in Soil at Campus Bay, EKI [3.5 MB pdf file] and October 1, 2007 DTSC Approval Letter [36 KB pdf file}  
 

 

 
  August 24, 2007 Final Memorandum for a Time-Critical Removal Action at the Former Forest Products Laboratory Wood Treatment Laboratory Tetratech EM inc. [1.4 MB pdf file]  
     
  September 17, 2007 DTSC Letter Approval for Forest Products Laboratory TCRA Implementation [16 KB pdf file]  
     
  September 17, 2007 DTSC Notice of Exemption for Former Forest Products Laboratory Wood Treatment Laboratory TCRA Implementation [372 KB pdf ile]  
     
  September 20, 2007 Soil Confirmation and Perimeter Air Monitoring Plan for Time Critical Removal Action at the Former Forest Products Laboratory Wood Treatment Laboratory [264 KB pdf file]  
     
  September 21, 2007 DTSC Letter Approval for Forest Products Laboratory TCRA Soil Confirmation and Perimeter Air Monitoring Plan [33 KB pdf file]  
     
  October 1- 30, 2007 DTSC Public Notice of Public Comment Period for Time Critical Removal Action at the Former Forest Products Laboratory Wood Treatment Laboratory [58 KB pdf file]  
     
  October 18, 2007 DTSC Comment Letter on the April 2, 2007 Draft Current Conditions Report [1.9 MB psf file]  
     
  October 23, 2007 DTSC Approval Letter for Use of MSRI Soil to Backfill TCRA Excavation [17 KB pdf file]  
     
  December 20, 2007 UC Berkeley Draft Response to Comments on the April 2, 2007 Draft Current Conditions Report [684 KB pdf file] and Transmittal Letter [16 KB pdf file]  
     
  February 13, 2008 Sampling Results for Western Stege Marsh Near-Surface Samples [1,320 KB pdf file]  
     
  February 13, 2008 Sampling Results for Western Transition Area Surface Soil Samples [1,430 KB pdf file]  
     
  March 14, 2008 Implementation Summary Report for a Time-Critical Removal Action at the Former Forest Products Laboratory Wood Treatment Laboratory University of California, Berkeley, Richmond Field Station, Richmond, California [24 MB pdf file]  
     
  March 18, 2008 Sampling Results for Surface Soil in the Pampas Grass Area near Building 201, University of California, Berkeley, Richmond Field Station, Richmond, California [423 KB pdf file]  
     
  April 9, 2008 DTSC Approval Letter of the March 14, 2008 Implementation Summary Report for a Time-Critical Removal Action at the Former FOrest Products Laboratory Wood Treatment Laboratory [18 KB pdf file]  
     
  July 11, 2008 Memorandum for a Time-Critical Removal Action at Two Campfire Locations in the Western Transition Area University of California, Berkeley Richmond Field Station, Richmond California Tetratech EMI [1.4 MB pdf file]  
     
  September 28, 2008 DTSC Notice of Public Comment Period Time Critical Removal Action University of California, Berkeley Richmond Field Station [1.8 MB pdf file]  
     
Monitoring and Management Reports and Plans (see also Restoration page)  
  June 30, 1941 East Bay Cityies Sewage Disposal Survey Report Upon the Collection, Treatement, and Disposal of Sewage and Industrial Wastes of the East Bay Cities, California [15MB pdf file] excerpts, by The Board of Consuliting Engineers for the Mayor and City Council of Berkeley and Seven Cooperating Cities  
     
  January 2004 Invasive/Exotic Vegetation Management Plan, BBL [2 MB pdf file]  
     
  August 2004 Western Stege Marsh Restoration Project Monitoring Plan, BBL [6MB pdf file]  
     
  December 3, 2004 Groundwater, Surface Water, and Sediment Monitoring Plan, Subunit 2, Meade Street Operable Unit, BBL [12 MB pdf file]  
     
  July 8, 2005 Summary of PCB Results Richmond FIeld Station BBL [8.1 MB pdf file} and Status Report on Polychlorinated Biphenyls in the Western Storm Drain UCB EH&S [796 KB pdf file]  
     
  August 2005 Western Stege Marsh Restoration Project Year 1 Monitoring Report [17 MB pdf file]  
     
  February 16, 2007 Interim Soil Management Plan for the Upland and Transition Areas, University of California, Berkeley, Richmond Field Station, Tetratech [10.6 MB pdf file]  
     
  March 15, 2007, DTSC Comments to Interim Soil Management Plan [119 KB file]  
     
  May 16, 2007 "Pyrite Cinder- containing Soils Management Procedures" letter report to DTSC [48 KB pdf file] and attachment "Regulatory Status of Soils Excavated During Replacement of Old Sewer Lines" (December 1993 DTSC) and "In- trench Reuse of Contaminated Trench Spoils from Utility Excavations" (SF RWQCB September 1995) [708 KB pdf file]  
     
  May 25, 2007 Concurrence letter from DTSC on Pyrite Cinder- containing Soils Management Procedures [15 KB pdf file]  
     
  August 10, 2007 Botanical Survey Report, URS Corp. [11.7 MB pdf file]  
     
  November 15, 2007 Year 2 Monitoring Report Western Stege Marsh Restoration Program [17 M pdf file] and Transmittal Letter [47 KB pdf file]  
     
  March 19, 2009 Year 3 Monitoring Report for the Western Stege Marsh Restoration Project [40.6MB pdf file]  
   