Publications

Title Author Year Publication type
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site Tetra Tech 2014 Report
2007.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2008.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2014.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2010.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 2: Vegetation Monitoring Report May & Associates, Inc 2010 Report
2016.09.26 Draft 2016 Groundwater Sampling Results Technical Memorandum Tetra Tech 2016 Report
2011.11.30 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary Terraphase 2011 Report
2002.11.06 Final Remedial Design Details - Addendum 2 Mercury Treatability Study Results URS 2002 Report
2013.04.17 Final Richmond Field Station Grassland Constraints Analysis Wildlife Research Associates; Jane Valerius Environmental Consulting 2013 Report
2012.01.20 Draft Phase II Sampling Results Technical Memorandum Tetra Tech 2012 Report
2022.06.06 Final RFS 5-Year Review Report UC Berkeley 2022 Report
2023.01.16 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2024.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2024 Report
2019.05.06 Mercury Fulminate Area Pilot Excavation Summary Tetra Tech 2019 Report
2018.01.16 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2015.02.20 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site Tetra Tech 2015 Report
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC UC Berkeley 2014 Report
2010.04.15 Final Phase I Groundwater Sampling Field Sampling Workplan Tetra Tech 2010 Report
2010.02.26 Letter Work Plan for Step-Out Sampling Locations on the University Of California Richmond Field Station, MW-25 Pilot Test Area, Lots 1 and 2, Former Zeneca Facility LFR 2010 Report
2010.10 RFS Invasive Weeds Annual Calendar UC Berkeley 2010 Report
2007.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2009.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2009 Report
2015.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2011.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report