Publications

Title Author Year Publication type
2017.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2005.06.16 Implementation Report Phase 3 Upland Portion of Subunit 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Task 4D, RWQCB Order No.01-102) URS 2005 Report
2013.03.01 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 4, 2013 Sampling Event Tetra Tech 2013 Report
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC Tetra Tech 2014 Report
2005.10.06 Draft Final Revised Removal Action Work Plan, Remaining Portions of East Stege Marsh to be Remediated, Campus Bay, Richmond, California LFR 2005 Report
2007.01 Best Management Practices for Disturbance of Soils Containing Pyrite Cinder Fill UC Berkeley 2006 Report
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix B, Health and Safety Plan Tetra Tech 2010 Report
1989.05 The Natural Areas of the University of California Richmond Field Station Joyce Gutstein 1989 Report
2007.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2008.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2014.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2010.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2008.03.11 Notification for Aquamaster Use to Control Invasive UC Berkeley 2008 Report
2018.11.02 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C Tetra Tech 2018 Report
2006.07.25 Sampling Event Results for PCB Area Tetra Tech 2006 Report
2012.11.16 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Response to Comments Terraphase 2012 Report
2020.01.14 Richmond Field Station Monthly Summary Report UC Berkeley 2020 Report
2021.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2021 Report
2025.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2025 Report
2019.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2006.10.04 Field Sampling Activities, Additional CPT Sample Location, UC Berkeley Richmond Field Station LFR 2006 Report
2007.06 Western Stege Marsh Restoration Project Monitoring, Spring 2007 The Watershed Project 2007 Report
2008.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2013.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2015.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report