September 2, 2011
The final sampling report for the first phase of groundwater monitoring in the wells installed in Fall 2010 incorporating DTSC comments has been placed on teh Techical Documents page of this website and is available at the following link: August 22, 2011 Final (Revision 1) Phase 1 Groudnwater Sampling Results Technical Memorandum