Publications

Title Author Year Publication type
2023.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2023.05.11 Nesting Bird Survey for UC Berkeley Field Station Richmond, CA BioMaAS 2023 Report
2023.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2023.04.12 Review of Draft Soil Management Plan, Revision 3 DTSC 2023 Agency Letter
2023.03.15 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2023.03.03 Draft Soil Management Plan, Revision 3 Tetra Tech 2023 Report
2023.02.24. Final B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Approval Letter DTSC 2023 Agency Letter
2023.02.16. Final B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report Tetra Tech 2023 Report
2023.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2023.01.24 Notification of Piezometer DHR, Abandonment Approval Letter DTSC 2023 Agency Letter
2023.02.06 Corporation Yard, Triplicates Sample Results Revised Approval DTSC 2023 Agency Letter
2023.02.06 Approval of Corporation Yard, Triplicates Sample Results DTSC 2023 Agency Letter
2023.02.03 Approval of Corporation Yard: East Meadow and Building 120 Area DTSC 2023 Agency Letter
2023.02.03 Approval of Eastern Transition Area, Revised Proposed Sampling Letter DTSC 2023 Agency Letter
2023.01.27 Corporation Yard, Triplicates Sample Results, Revised Tetra Tech 2023 Technical Letter
2023.01.20 Notification of Piezometer DHR Abandonment, Revised Tetra Tech 2023 Technical Letter
2023.01.19 Corporation Yard: East Meadow and Building 120 Area, Revised Tetra Tech 2023 Technical Letter
2023.01.16 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2023.01.04 Review of Notification of Piezometer DHR Abandonment DTSC 2023 Agency Letter
2022.12.21 Eastern Transition Area, Revised Proposed Sampling Tetra Tech 2022 Technical Letter
2022.12.16 Notification of Piezometer DHR Abandonment Tetra Tech 2022 Technical Letter
2022.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2022 Report
2022.11.22 B118 Fire Wall SMP Form A UC Berkeley 2022 Technical Letter
2022.11.22 B118 Fire Wall SMP Form B UC Berkeley 2022 Technical Letter
2022.11.21 Review of Eastern Transition Area, Proposed Sampling DTSC 2022 Agency Letter