2020.10.27 NRLF Retention Area Sampling Results Letter and Form B, DTSC Comment Letter |
DTSC |
2020 |
Agency Letter |
2022.11.10 Review of Corporation Yard: East Meadow and Building 120 Area |
DTSC |
2022 |
Agency Letter |
2011.07.27 Year 5 Monitoring Report DTSC Concurrence Letter of May 16, 2011 Response to Comments |
DTSC |
2011 |
Agency Letter |
2017.01.17 Phase V Field Sampling Plan DTSC Approval Letter |
DTSC |
2017 |
Agency Letter |
2011.10.05 Final Phase II Field Sampling Plan (SAP), DTSC Approval Letter |
DTSC |
2011 |
Agency Letter |
2021.03.22 RFS MFA Removal Action Completion Report, DTSC Approval Letter |
DTSC |
2021 |
Agency Letter |
2022.07.25 Final EPA North Meadow PCB Cleanup and Removal Action Implementation DTSC Approval Letter |
DTSC |
2022 |
Agency Letter |
2015.09.25 Draft 2015 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2015 |
Agency Letter |
2011.07.21 Final Phase 1 Groundwater Sampling Results Technical Memorandum, Comment Letter |
DTSC |
2011 |
Agency Letter |
2011.09.12 Final Technical Memorandum for Well Destructions, Approval Letter |
DTSC |
2011 |
Agency Letter |
2018.12.03 NRLF DTSC Results Comments |
DTSC |
2018 |
Agency Letter |
2016.03.28 Proposed Continued Groundwater Monitoring Locations for 2016 DTSC Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.04.22 DTSC Comment Letter on Phase IV Sampling Results Technical Memorandum |
DTSC |
2016 |
Agency Letter |
2014.07.18 Final Removal Action Workplan, Approval Letter |
DTSC |
2014 |
Agency Letter |
2012.12.04 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.03.23 Technical Memorandum for Well Closures, Comment Letter |
DTSC |
2012 |
Agency Letter |
2020.10.29 DRAFT Removal Action Workplan RES Area and Groundwater Five-Year Review, DTSC Comment Letter |
DTSC |
2020 |
Agency Letter |
2005.09.29 DTSC letter |
DTSC |
2005 |
Agency Letter |
2012.03.14 Phase II Sampling Results Technical Memorandum, DTSC Comment Letter |
DTSC |
2012 |
Agency Letter |
2008.12.29 Final Current Conditions Report, Approval Letter |
DTSC |
2008 |
Agency Letter |
2021.04.28. Stege Marsh Rail Survey.DTSC Approval Letter (incl ME memo) |
DTSC |
2021 |
Agency Letter |
2023.01.24 Notification of Piezometer DHR, Abandonment Approval Letter |
DTSC |
2023 |
Agency Letter |
2017.05.24 Sub-Slab Vapor Monitoring, Building 478 DTSC Approval Letter |
DTSC |
2017 |
Agency Letter |
2019.09.23 Draft 2019 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2019 |
Agency Letter |
2016.12.09 Draft Phase V Field Sampling Plan DTSC Comment Letter |
DTSC |
2016 |
Agency Letter |
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter |
DTSC |
2014 |
Agency Letter |
2007.09.17 Time Critical Removal Action at the Former FPL, Notice of Exemption |
DTSC |
2007 |
Agency Letter |
2023.04.12 Review of Draft Soil Management Plan, Revision 3 |
DTSC |
2023 |
Agency Letter |
2015.08.14 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation, Approval Letter |
DTSC |
2015 |
Agency Letter |
2007.06.29 DTSC Summary of Violations |
DTSC |
2007 |
Agency Letter |
2011.03.29 Proposed Continued Groundwater Monitoring Locations DTSC Approval Letter |
DTSC |
2011 |
Agency Letter |
2010.11.19 Year 5 Monitoring Report, DTSC Comments |
DTSC |
2010 |
Agency Letter |
2017.12.15 Draft 2017 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2017 |
Agency Letter |
2007.10.01 Technical Memorandum: Background Conditions of Arsenic in Soil at Campus Bay, Approval Letter |
DTSC |
2007 |
Agency Letter |
2019.12.30 Draft 2019 Groundwater Sampling Results Technical Memorandum, DTSC Approval Letter |
DTSC |
2019 |
Agency Letter |
2007.10.23 Back fill approval for FPL Time Critical Removal Action |
DTSC |
2007 |
Agency Letter |
2021.04.28.Groundwater Sampling.DTSC Approval Letter |
DTSC |
2021 |
Agency Letter |
2019.11.25 NRLF Summary Results DTSC No Comment Letter |
DTSC |
2019 |
Agency Letter |
2009.04.23 Implementation Summary Report for a Time-Critical Removal Action at Two Campfire Locations in the Western Transition Area, Comment Letter |
DTSC |
2009 |
Agency Letter |
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter |
DTSC |
2014 |
Agency Letter |
2015.12.29 FINAL Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum DTSC Approval Letter |
DTSC |
2015 |
Agency Letter |
2009.05.29 Implementation Summary Report for a Time-Critical Removal Action at Two Subareas in the Western Transition Area Approval Letter |
DTSC |
2009 |
Agency Letter |
2012.08.03 Phase III Field Sampling Plan, Approval Letter |
DTSC |
2012 |
Agency Letter |
2008.04.09 FPL Time Critical Removal Action Summary Report, Approval Letter |
DTSC |
2008 |
Agency Letter |
2020.06.17 Corporation Yard, Triplicates Sampling Approach, Comment Letter |
DTSC |
2020 |
Agency Letter |
2023.02.03 Approval of Corporation Yard: East Meadow and Building 120 Area |
DTSC |
2023 |
Agency Letter |
2019.11.25 NRLF Bioretention Area Sampling Approach, DTSC Comment Letter |
DTSC |
2019 |
Agency Letter |
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter |
DTSC |
2012 |
Agency Letter |
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter |
DTSC |
2014 |
Agency Letter |
2022.07.27 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples Approval |
DTSC |
2022 |
Agency Letter |