Publications

Title Author Year Publication typesort descending
2020.10.27 NRLF Retention Area Sampling Results Letter and Form B, DTSC Comment Letter DTSC 2020 Agency Letter
2022.11.10 Review of Corporation Yard: East Meadow and Building 120 Area DTSC 2022 Agency Letter
2011.07.27 Year 5 Monitoring Report DTSC Concurrence Letter of May 16, 2011 Response to Comments DTSC 2011 Agency Letter
2017.01.17 Phase V Field Sampling Plan DTSC Approval Letter DTSC 2017 Agency Letter
2011.10.05 Final Phase II Field Sampling Plan (SAP), DTSC Approval Letter DTSC 2011 Agency Letter
2021.03.22 RFS MFA Removal Action Completion Report, DTSC Approval Letter DTSC 2021 Agency Letter
2022.07.25 Final EPA North Meadow PCB Cleanup and Removal Action Implementation DTSC Approval Letter DTSC 2022 Agency Letter
2015.09.25 Draft 2015 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2015 Agency Letter
2011.07.21 Final Phase 1 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2011 Agency Letter
2011.09.12 Final Technical Memorandum for Well Destructions, Approval Letter DTSC 2011 Agency Letter
2018.12.03 NRLF DTSC Results Comments DTSC 2018 Agency Letter
2016.03.28 Proposed Continued Groundwater Monitoring Locations for 2016 DTSC Approval Letter DTSC 2016 Agency Letter
2016.04.22 DTSC Comment Letter on Phase IV Sampling Results Technical Memorandum DTSC 2016 Agency Letter
2014.07.18 Final Removal Action Workplan, Approval Letter DTSC 2014 Agency Letter
2012.12.04 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2012 Agency Letter
2012.03.23 Technical Memorandum for Well Closures, Comment Letter DTSC 2012 Agency Letter
2020.10.29 DRAFT Removal Action Workplan RES Area and Groundwater Five-Year Review, DTSC Comment Letter DTSC 2020 Agency Letter
2005.09.29 DTSC letter DTSC 2005 Agency Letter
2012.03.14 Phase II Sampling Results Technical Memorandum, DTSC Comment Letter DTSC 2012 Agency Letter
2008.12.29 Final Current Conditions Report, Approval Letter DTSC 2008 Agency Letter
2021.04.28. Stege Marsh Rail Survey.DTSC Approval Letter (incl ME memo) DTSC 2021 Agency Letter
2023.01.24 Notification of Piezometer DHR, Abandonment Approval Letter DTSC 2023 Agency Letter
2017.05.24 Sub-Slab Vapor Monitoring, Building 478 DTSC Approval Letter DTSC 2017 Agency Letter
2019.09.23 Draft 2019 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2019 Agency Letter
2016.12.09 Draft Phase V Field Sampling Plan DTSC Comment Letter DTSC 2016 Agency Letter
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter DTSC 2014 Agency Letter
2007.09.17 Time Critical Removal Action at the Former FPL, Notice of Exemption DTSC 2007 Agency Letter
2023.04.12 Review of Draft Soil Management Plan, Revision 3 DTSC 2023 Agency Letter
2015.08.14 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation, Approval Letter DTSC 2015 Agency Letter
2007.06.29 DTSC Summary of Violations DTSC 2007 Agency Letter
2011.03.29 Proposed Continued Groundwater Monitoring Locations DTSC Approval Letter DTSC 2011 Agency Letter
2010.11.19 Year 5 Monitoring Report, DTSC Comments DTSC 2010 Agency Letter
2017.12.15 Draft 2017 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2017 Agency Letter
2007.10.01 Technical Memorandum: Background Conditions of Arsenic in Soil at Campus Bay, Approval Letter DTSC 2007 Agency Letter
2019.12.30 Draft 2019 Groundwater Sampling Results Technical Memorandum, DTSC Approval Letter DTSC 2019 Agency Letter
2007.10.23 Back fill approval for FPL Time Critical Removal Action DTSC 2007 Agency Letter
2021.04.28.Groundwater Sampling.DTSC Approval Letter DTSC 2021 Agency Letter
2019.11.25 NRLF Summary Results DTSC No Comment Letter DTSC 2019 Agency Letter
2009.04.23 Implementation Summary Report for a Time-Critical Removal Action at Two Campfire Locations in the Western Transition Area, Comment Letter DTSC 2009 Agency Letter
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter DTSC 2014 Agency Letter
2015.12.29 FINAL Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum DTSC Approval Letter DTSC 2015 Agency Letter
2009.05.29 Implementation Summary Report for a Time-Critical Removal Action at Two Subareas in the Western Transition Area Approval Letter DTSC 2009 Agency Letter
2012.08.03 Phase III Field Sampling Plan, Approval Letter DTSC 2012 Agency Letter
2008.04.09 FPL Time Critical Removal Action Summary Report, Approval Letter DTSC 2008 Agency Letter
2020.06.17 Corporation Yard, Triplicates Sampling Approach, Comment Letter DTSC 2020 Agency Letter
2023.02.03 Approval of Corporation Yard: East Meadow and Building 120 Area DTSC 2023 Agency Letter
2019.11.25 NRLF Bioretention Area Sampling Approach, DTSC Comment Letter DTSC 2019 Agency Letter
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter DTSC 2012 Agency Letter
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter DTSC 2014 Agency Letter
2022.07.27 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples Approval DTSC 2022 Agency Letter