2007.08.24 Final Memorandum for a Time-Critical Removal Action at the Former Forest Products Laboratory Wood Treatment Laboratory |
Tetra Tech |
2007 |
Report |
2007.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2009.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2015.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2011.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2009.03.16 Public Health Assessment Evaluation of Exposure to Contaminants from the Zeneca/Campus Bay Site (PHA) |
Department of Public Health |
2009 |
Report |
2002.02.28 Final Workplan for Additional Sediment and Surface Water Sampling, Marsh Portion of Subunit 2B |
URS |
2002 |
Report |
2021.05.28 Mercury Fulminate Area, Completion Report, Final Version |
Tetra Tech |
2021 |
Report |
2019.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2004.01.30 Invasive/Exotic Vegetation Management Plan |
BBL |
2004 |
Report |
2017.04.12 Final Soil Management Plan, Revision 1, Removal Action Workplan, Attachment C |
Tetra Tech |
2017 |
Report |
2013.05.28 Final Site Characterization Report |
Tetra Tech |
2013 |
Report |
2011.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2008.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |
2014.02.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2016.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2007.07.23 Technical Memorandum: Background Concentrations of Arsenic in Soil at Campus Bay |
Erler & Kalinowski, Inc. |
2007 |
Report |
2009.02.23 Implementation Summary Report for a Time- Critical Removal Action at Two Campfire Locations in the Western Transition Area |
Tetra Tech |
2009 |
Report |
2008.03.14 Implementation Summary Report for a Time-Critical Removal Action at the Former Forest Products Wood Treatment Laboratory |
Tetra Tech |
2008 |
Report |
2016.03.21 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |
2022.08.22 Draft B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report |
Tetra Tech |
2022 |
Report |
2023.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2018.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2017.03.06 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples January 18, 2017, Sampling Event |
UC Berkeley |
2017 |
Report |
2014.10.08 PEERpipevalve Form A |
UC Berkeley; Tetra Tech |
2014 |
Report |
2010.04.15 Final Field Sampling Workplan Appendix B, Health and Safety Plan |
Tetra Tech |
2010 |
Report |
2009.09.14 Response to Comments from DTSC for the Second Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2 |
LFR |
2009 |
Report |
1992.08.24 Richmond Field Station Lepidoptera Survey, Revised |
Jerry A. Powell |
1992 |
Report |
2007.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2013.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2010.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 1: Year 5 Hydrologic Monitoring Report |
Kamman Hydrology & Engineering, Inc |
2010 |
Report |
2012.12.06 East Stege Marsh Operations and Maintenance Plan |
Arcadis |
2013 |
Report |
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2014 |
Report |
2002.08.16 Final Remedial Design Details - Addendum |
URS |
2002 |
Report |
2008.03.18 Sampling Results for Surface Soil in the Pampas Grass Area near Building 201 |
Tetra Tech |
2008 |
Report |
2017.10.25 EPA North Meadow Field Sampling Plan |
UC Berkeley |
2017 |
Report |
2020.03.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2021.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2022.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2017.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2018.03.14 Final 2017 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2018 |
Report |
2006.01.18 Provisional Joint Health Statement Summary The Zeneca and UC Richmond Field Station Sites |
Contra Costa County Health Services Department; California Department of Health Services |
2006 |
Report |
2011.05.11 Final Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2004.02.14 West Stege Marsh Upland Revegetation Plan (2003-5) |
The Aquatic Outreach Institute |
2004 |
Report |
2012.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2013.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2015.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |