2009.05.26 Sampling Results for Stormwater within the Western Stege Marsh |
Tetra Tech |
2009 |
Report |
2016.05.16 Final Phase IV Sampling Results Technical Memorandum (no appendices) |
Tetra Tech |
2016 |
Report |
2007.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2013.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2010.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2012.03.08 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Response to Comments |
Terraphase |
2012 |
Report |
2006.12.18 Surface Water, Sediment, and Stormwater Sampling Summary Report |
Tetra Tech |
2006 |
Report |
2021.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2008.11.21 (5) Final Current Conditions Report Appendix J - Hydrogeologic Summary Report |
Tetra Tech |
2008 |
Report |
2017.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2008.08.22 Indoor Air Monitoring Report |
Tetra Tech |
2008 |
Report |
2018.08.28 TSCA PCB Risk-based Disposal Approval Application EPA North Meadow |
UC Berkeley |
2018 |
Report |
2005.12.08 Revised Technical Specifications for Well Destructions |
Stellar Environmental Solutions |
2005 |
Report |
2011.02.25 Response to Department of Toxic Substances Control’s Comments on the “Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility |
Arcadis |
2011 |
Report |
2012.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2013.09.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2015.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2011.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2001.10.31 Final Report Results of Additional Soil and Groundwater Investigation |
URS |
2003 |
Report |
2018.07.27 Draft 2018 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2018 |
Report |
2012.11.21 Sampling Results for Soil Samples Collected for the Building 445 Landscaping Project |
Tetra Tech |
2012 |
Report |
2021.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2023.05.11 Nesting Bird Survey for UC Berkeley Field Station Richmond, CA |
BioMaAS |
2023 |
Report |
2019.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2004.08 Western Stege Marsh Restoration Project Monitoring Plan |
BBL |
2004 |
Report |
2014.04.16 Final Richmond Bay Campus Coastal Terrace Prairie Management Plan |
Mark Stromberg |
2014 |
Report |
2012.12.12 Final Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2006.10.13 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2006 |
Report |
2012.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2009.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2016.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2000.12 Final Field Sampling and Analyses Results |
URS |
2000 |
Report |
2002.02.28 Workplan for Additional Soil and Groundwater Investigation |
URS |
2002 |
Report |
2022.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2022.10.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2019.06.25 Revised Mercury Fulminate Area Excavation Pilot Study Summary |
Tetra Tech |
2019 |
Report |
2018.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2014.11.03 PEERfootings Form A and July 18, 2014 Soil Sampling Letter to DTSC |
UC Berkeley; Tetra Tech |
2014 |
Report |
2009.06.22 Workplan for Evaluation of Pre-Construction Conditions in Soil, Meade By-pass Roadway |
PES Environmental, Inc |
2009 |
Report |
1994.11 Richmond Field Station Lepidoptera Survey, Revised |
Jerry A. Powell |
1994 |
Report |
2012.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2008.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |
2014.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2010.05.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project |
Tetra Tech |
2010 |
Report |
2002.02.28 Final Workplan for Additional Sediment and Surface Water Sampling, Marsh Portion of Subunit 2B |
URS |
2002 |
Report |
2021.05.28 Mercury Fulminate Area, Completion Report, Final Version |
Tetra Tech |
2021 |
Report |
2017.04.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2007.09.20 Soil Confirmation and Perimeter Air Monitoring Plan |
UC Berkeley |
2007 |
Report |