Publications

Title Author Yearsort descending Publication type
2012.10.23 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2012.10. 25 Conservation of the Remnant Coastal Prairie at UC Berkeley's Richmond Field Station Alan Cai; Patrick Donnelly-Shores 2012 Report
2012.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.11.16 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Response to Comments Terraphase 2012 Report
2012.11.21 Sampling Results for Soil Samples Collected for the Building 445 Landscaping Project Tetra Tech 2012 Report
2012.12.04 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2012 Agency Letter
2012.12.12 Final Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.12.17 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.12.18 Draft Groundwater Investigation Within and in the Vicinity of the BAPB at the Richmond Field Station Terraphase 2012 Report
2013.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.02.01 RFS Natural Areas Restoration: Western Stege Marsh, Coastal Terrace Prairie UC Berkeley 2013 Presentation
2013.02.01 Final Technical Approach for Human Health Risk Assessment, Site Characterization Report, Proposed Richmond Bay Campus Tetra Tech 2013 Report
2013.02.14 Draft Site Characterization Report, Proposed Richmond Bay Campus, Comment Letter DTSC 2013 Agency Letter
2013.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.03.01 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 4, 2013 Sampling Event Tetra Tech 2013 Report
2013.03.05 Notification of Piezometer Abandonment and Installation Tetra Tech 2013 Report
2013.03.08 Notification of Piezometer Abandonment and Installation, and Scope of Work, Approval Letter DTSC 2013 Agency Letter
2013.03.08 Notification of Piezometer Abandonment and Installation, and Scope of Work, Approval Letter DTSC 2013 Agency Letter
2013.03.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.04.17 Final Richmond Field Station Grassland Constraints Analysis Wildlife Research Associates; Jane Valerius Environmental Consulting 2013 Report
2013.05.02 Site Characterization Report Approval Letter DTSC 2013 Agency Letter
2013.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.05.20 Draft Groundwater Investigation Within and In the Vicinity of the BAPB at the Richmond Field Station, Comment Letter DTSC 2013 Agency Letter
2013.05.28 Final Site Characterization Report Tetra Tech 2013 Report