Publications

Titlesort descending Author Year Publication type
2010.05.26 Final Phase I Groundwater Sampling Field Sampling Workplan; Appendix A, Quality Assurance Project Plan, and Appendix B, Health and Safety Plan, Approval Letter DTSC 2010 Agency Letter
2010.06 Appendix A: Historical Maps and Imagery Western Stege Marsh Restoration Project Site Kamman Hydrology & Engineering, Inc 2010 Figure
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan Tetra Tech 2010 Report
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix A, Quality Assurance Project Plan Tetra Tech 2010 Report
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix B, Health and Safety Plan Tetra Tech 2010 Report
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Figure 7 Groundwater Sampling Locations Tetra Tech 2010 Figure
2010.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.08.16 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.09.30 Fifth Annual Monitoring Report East Stege Marsh Arcadis 2010 Report
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project Tetra Tech 2010 Report
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 1: Year 5 Hydrologic Monitoring Report Kamman Hydrology & Engineering, Inc 2010 Report
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 2: Vegetation Monitoring Report May & Associates, Inc 2010 Report
2010.10 RFS Invasive Weeds Annual Calendar UC Berkeley 2010 Report
2010.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.11.19 Year 5 Monitoring Report, DTSC Comments DTSC 2010 Agency Letter
2010.11.24 Letter Work Plan to Evaluate Groundwater in Select Areas at the University of California Richmond Field Station, Response to Comments Arcadis 2010 Report
2010.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2011.01.12 Draft Phase I Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2011.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.02.25 Response to Department of Toxic Substances Control’s Comments on the “Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility Arcadis 2011 Report
2011.03.08 Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility Approval Letter DTSC 2011 Agency Letter