Publications

Title Author Year Publication typesort ascending
2023.01.27 Corporation Yard, Triplicates Sample Results, Revised Tetra Tech 2023 Technical Letter
2023.01.20 Notification of Piezometer DHR Abandonment, Revised Tetra Tech 2023 Technical Letter
2023.01.19 Corporation Yard: East Meadow and Building 120 Area, Revised Tetra Tech 2023 Technical Letter
2022.12.21 Eastern Transition Area, Revised Proposed Sampling Tetra Tech 2022 Technical Letter
2022.12.16 Notification of Piezometer DHR Abandonment Tetra Tech 2022 Technical Letter
2022.09.21 Eastern Transition Area, Proposed Sampling Tetra Tech 2022 Technical Letter
2022.08.24 Corporation Yard: East Meadow and Building 120 Area Tetra Tech 2022 Technical Letter
2022.05.23 Corporation Yard, Triplicates Sample Results Tetra Tech 2022 Technical Letter
2022.11.22 B118 Fire Wall SMP Form B UC Berkeley 2022 Technical Letter
2022.11.22 B118 Fire Wall SMP Form A UC Berkeley 2022 Technical Letter
2022.11.17 Implementation of Soil Management Plan, Intercollegiate Athletics (IA) Throw Area Tetra Tech 2022 Technical Letter
2022.10.11 IA Throw Area Form B and Sampling Plan Tetra Tech 2022 Technical Letter
2022.10.11 IA Throw Area Form A UC Berkeley 2022 Technical Letter
2021.08.19 B277 Form B signed and Sampling Results Summary Tetra Tech 2021 Technical Letter
2021.05.11 B277 Strong Floor Form B and Sampling Plan Tetra Tech 2021 Technical Letter
2021.05.11 B277 Strong Floor Form A UC Berkeley 2021 Technical Letter
2022.06.09 DTSC 5-Year Review Approval Letter DTSC 2022 Technical Letter
2020.03.10 Sampling Results for Western Stege Marsh Near-Surface Sediment Sample January 24, 2022 UC Berkeley 2022 Technical Letter
2021.07.19 DTSC Response to RSSA CAG Letter Regarding Datums DTSC 2021 Technical Letter
2021.02.19 Mercury Fulminate Area, Completion Report, Response to DTSC Comments Tetra Tech 2021 Technical Letter
2020.12.18 Corporation Yard, Triplicates Sampling Approach, Additional Information Tetra Tech 2020 Technical Letter
2020.11.06 Corporation Yard, Triplicates Sampling Approach, Revised Response to DTSC and HERO Comments Tetra Tech 2020 Technical Letter
2020.10.16 RFS Phase V Western Transition Area Letter Report Tetra Tech 2020 Technical Letter
2020.10.06 2020 Groundwater Sampling Results Technical Memorandum Tetra Tech 2020 Technical Letter
2020.09.01 Notification of Piezometer B278 and CTPS Abandonment and Reinstallation Tetra Tech 2020 Technical Letter