2001.11.21 Final Results of Additional Soil and Groundwater Investigations and Groundwater Monitoring Plan, Upland Portion of Subunit 2A, Volume 1 of 2 URS 2001 Report
2021.07.01 Richmond Field Station Project: Botanical Survey Report Rana Creek Habitat Restoration 2021 Report
2023.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2018.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2018.07.02 NRLF Phase 4 Form B and Sampling Plan UC Berkeley; Tetra Tech 2018 Report
2017.01.05 Final Phase V Field Sampling Plan Tetra Tech 2017 Report
2014.10.06 Final Phase IV Field Sampling Plan Tetra Tech 2014 Report
2013.10.10 Final 2013 Groundwater Sampling Results Technical Memorandum Tetra Tech 2013 Report
2006.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2006 Report
2013.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2014.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2016.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2016 Report
2019.01.31 2018 Campus Bay Annual Groundwater and Surface Water Monitoring Report Appendicies Terraphase 2019 Report
2015.06.01 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation UC Berkeley 2015 Report
2019.04.11 DTSC Update Richmond Southeast Shoreline Sites DTSC 2019 Report
2012.03.06 Wetland Determination, Western Stege Marsh Tetra Tech 2012 Report
1991.02.22 Final Risk Assessment Report Jonas & Associates Inc 1991 Report
2006.10.31 Health and Safety Plan Addendum Tetra Tech 2006 Report
2021.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2021 Report
2017.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2005.06.16 Implementation Report Phase 3 Upland Portion of Subunit 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Task 4D, RWQCB Order No.01-102) URS 2005 Report
2013.03.01 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 4, 2013 Sampling Event Tetra Tech 2013 Report
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC Tetra Tech 2014 Report
2005.10.06 Draft Final Revised Removal Action Work Plan, Remaining Portions of East Stege Marsh to be Remediated, Campus Bay, Richmond, California LFR 2005 Report
2007.01 Best Management Practices for Disturbance of Soils Containing Pyrite Cinder Fill UC Berkeley 2006 Report
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix B, Health and Safety Plan Tetra Tech 2010 Report
1989.05 The Natural Areas of the University of California Richmond Field Station Joyce Gutstein 1989 Report
2007.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2008.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2014.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2010.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2008.03.11 Notification for Aquamaster Use to Control Invasive UC Berkeley 2008 Report
2018.11.02 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C Tetra Tech 2018 Report
2006.07.25 Sampling Event Results for PCB Area Tetra Tech 2006 Report
2012.11.16 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Response to Comments Terraphase 2012 Report
2020.01.14 Richmond Field Station Monthly Summary Report UC Berkeley 2020 Report
2020.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2020 Report
2022.07.23 Final EPA North Meadow PCB Cleanup and Removal Action Implementation Summary Report Tetra Tech 2022 Report
2019.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2006.10.04 Field Sampling Activities, Additional CPT Sample Location, UC Berkeley Richmond Field Station LFR 2006 Report
2007.06 Western Stege Marsh Restoration Project Monitoring, Spring 2007 The Watershed Project 2007 Report
2008.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2013.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2015.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2011.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
1994.01.28 Richmond Research Center Master Plan, Environmental Impact Report Brady and Associates 1994 Report
2010.04.15 Final Field Sampling Workplan: Appendix A, Quality Assurance Project Plan Tetra Tech 2010 Report
1989.08 Environmental Assessment of University of California Richmond Field Station Ensco Environmental Services 1989 Report
2021.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2021 Report
2023.02.16. Final B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report Tetra Tech 2023 Report