2016.02.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.03.10 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.03.17 Building 280A and Building 450 Soil Sampling Results, Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.03.21 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |
2016.03.28 Proposed Continued Groundwater Monitoring Locations for 2016 DTSC Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.03.30 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |
2016.03.24 B163PHYTOREM Forms and B including sampling results and Work Plan |
UC Berkeley |
2016 |
Report |
2016.04.14 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.04.22 DTSC Comment Letter on Phase IV Sampling Results Technical Memorandum |
DTSC |
2016 |
Agency Letter |
2016.05.12 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.05.16 Final Phase IV Sampling Results Technical Memorandum (no appendices) |
Tetra Tech |
2016 |
Report |
2016.05.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.05.16 Final Phase IV Sampling Results Technical Memorandum |
Tetra Tech |
2016 |
Report |
2016.06.03 TSRCB445 Forms A and B for kiosk installation |
UC Berkeley |
2016 |
Report |
2016.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.06.17 Imported Soils Sampling and Analysis Requirements to Assess Contaminant Concentrations |
UC Berkeley |
2016 |
White Paper |
2016.07.15 Draft Phase V Field Sampling Plan, Transmittal Letter |
Tetra Tech |
2016 |
Transmittal Letter |
2016.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.07.18 Draft Phase V Field Sampling Plan |
Tetra Tech |
2016 |
Report |
2016.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.12.09 Draft Phase V Field Sampling Plan DTSC Comment Letter |
DTSC |
2016 |
Agency Letter |
2016.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.09.26 Draft 2016 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2016 |
Report |
2016.09.27 Draft Soil Management Plan, Revision 1 |
Tetra Tech |
2016 |
Report |
2016.09.27 Draft Soil Management Plan, Revision 1 Transmittal Letter |
Tetra Tech |
2016 |
Transmittal Letter |
2016.10.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.11.16 Calendar for Implementation, Richmond Field Station Site, Approval |
DTSC |
2016 |
Agency Letter |
2016.11.16 DTSC Approval Letter of Revised Schedule |
DTSC |
2016 |
Agency Letter |
2016.12.14 Draft Soil Management Plan, Revision 1, DTSC Comment Letter |
DTSC |
2016 |
Agency Letter |
2016.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2017.01.05 Figure 3 Marsh Area Ownership |
Tetra Tech |
2017 |
Figure |
2017.01.05 Final Phase V Field Sampling Plan |
Tetra Tech |
2017 |
Report |
2017.01.05 Final Phase V Field Sampling Plan Cover Letter |
Tetra Tech |
2017 |
Transmittal Letter |
2017.01.09 Final 2016 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2017 |
Report |
2017.01.09 Final 2016 Groundwater Sampling Results Technical Memorandum Cover Letter |
Tetra Tech |
2017 |
Transmittal Letter |
2017.01.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2017.01.17 Phase V Field Sampling Plan DTSC Approval Letter |
DTSC |
2017 |
Agency Letter |
Coastal Prairie Big Meadow 2016 and 2017 Mow Lines with Native Richness |
UC Berkeley |
2017 |
Figure |
February 2017 Big Meadow with 2016 Mow Lines and Species Richness |
UC Berkeley |
2017 |
Figure |
2017.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2017.03.06 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples January 18, 2017, Sampling Event |
UC Berkeley |
2017 |
Report |
2017.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2017.03.24 Proposed Continued Groundwater Monitoring Locations for 2017 |
Tetra Tech |
2017 |
Report |
2017.04.12 Final Soil Management Plan, Revision 1, Removal Action Workplan, Attachment C |
Tetra Tech |
2017 |
Report |
2017.04.12 Sub‐Slab Vapor Monitoring, Building 478 Technical Memorandum |
Terraphase |
2017 |
Report |
2017.04.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2017.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |