1990.03.27 Update Letter to Department of Health Services |
UC Berkeley |
1990 |
Transmittal Letter |
2015.08.12 Removal Action Workplan, Corporatin Yard Soil Removal Action Final Construction Drawings and Specifications Transmittal Letter |
UC Berkeley |
2015 |
Transmittal Letter |
2020.01.30 Final 2019 Groundwater Sampling Results Technical Memorandum, Transmittal Letter |
UC Berkeley |
2020 |
Transmittal Letter |
2009.03.19 Year 3 Monitoring Report for the Western Stege Marsh Restoration Project Cover Letter |
UC Berkeley |
2003 |
Transmittal Letter |
2007.12.20 Draft Current Conditions Report, Response to Comments Transmittal |
UC Berkeley |
2007 |
Transmittal Letter |
2003.07.16 Project and Environmental Approval for the Richmond Field Station Remediation Project |
UC Berkeley |
2003 |
Transmittal Letter |
2005.07 Tentative Order Rescission of Order No. 01-101 Site Cleanup Requirement for: Zeneca Inc., 1415 South 47th Street, Richmond, Contra Costa County, Meade Street Operable Unit Subunit 1 |
San Francisco Regional Water Quality Control Board |
2005 |
Orders & Permits |
2006.09.27 UC Site Investigation and Remediation Order, Section 6.1 |
UC Berkeley |
2006 |
Orders & Permits |
2003.09.04 Department of the Army, Corps of Engineers, File Number 28135S- Western Stege Marsh Remediation and Restoration (Army Nationwide Permit 38 Authorization) |
USACE |
2003 |
Orders & Permits |
2005.07 Tentative Order Rescission of Order No. 01-102 Site Cleanup Requirement for: University of California Richmond Field Station, 1301 South 46th Street, Richmond, Contra Costa County, Meade Street Operable Unit Subunit 2 |
San Francisco Regional Water Quality Control Board |
2005 |
Orders & Permits |
2015.01.26 BCDC Permit Revision Number 3 |
BCDC |
2015 |
Orders & Permits |
2003.06.23 Revision to Permit No. M01-52 Western Stege Marsh Remediation and Restortation Project, Richmond, California San Francisco Bay Conservation and Development Commission |
BBL |
2003 |
Orders & Permits |
2004.04.26 Covenant and Environmental Restriction on Property, Campus Bay Site |
RWQCB |
2004 |
Orders & Permits |
2003.07.24 Additional Information Requested to Complete Revision to Permit No. M01-51 for the UC Berkeley RFS Remediation Project at Stege Marsh |
BBL |
2003 |
Orders & Permits |
2005.10.19 Tetnative Order Rescission of Order No. 01-102 Site Cleanup Requirements for: University of California Berkeley, Zeneca Inc, University of California Richmond Field Station, Meade Street Operable Unit, Subunit 2 |
San Francisco Regional Water Quality Control Board |
2005 |
Orders & Permits |
2006.09.15 State of California Department of Toxic Substances Control Site Investigation and Remediation Order, Docket No. I/SE-RAO 0607-004 (RFS) |
DTSC |
2006 |
Orders & Permits |
2003.10.17 Bay Conservation and Development Commission Permit No. M01-52(b) Amendment No. One |
BCDC |
2003 |
Orders & Permits |
2006.09.15 State of California Department of Toxic Substances Control Site Investigation and Remediation Order, Docket No. I/SE-RAO 0607-004 (Zeneca) |
DTSC |
2006 |
Orders & Permits |
2004.06.18 Bay Conservation and Development Commission Permit No. M01-52(b) Amendment No. Two Extension |
BCDC |
2004 |
Orders & Permits |
2001.10 California Regional Water Quality Control Board San Francisco Bay Region Order No. 01-102 Site Cleanup Requirements for: University of California Berkeley Zeneca Inc. Meade Street Operable Unit Subunit 2 |
RWQCB |
2001 |
Orders & Permits |
2003.06.24 Nationwide Permit 38 Modification Request (ACOE File No. 25417S) Western Stege Marsh Remediation and Restoration Project at Richmond Field Station US Army Corpos of Engineers, Regulatory Branch |
BBL |
2003 |
Orders & Permits |
2002.03.19 RWQCB Water Quality Certification for Cleanup Activities Required by SCRs 01-101 and 01-102 |
RWQCB |
2002 |
Orders & Permits |
2003.06.27 Nationwide Permit 38 Modification Request (ACOE File No. 25417S) Summary Letter to USACE and USFWS |
BBL |
2003 |
Orders & Permits |
2006.09.27 University of California (UC) Site Investigation and Remediation Order, Section 6.2 |
UC Berkeley |
2006 |
Orders & Permits |
2007.06 Spring 2007 Vegetation Monitoring Photos |
|
2007 |
Figure |
2019.10.24 Mercury Fulminate Area Excavation Plan |
Tetra Tech |
2019 |
Figure |
2007.10.12 TCRA Air Monitoring PDR Location Map |
UC Berkeley |
2007 |
Figure |
2010.06 Appendix A: Historical Maps and Imagery Western Stege Marsh Restoration Project Site |
Kamman Hydrology & Engineering, Inc |
2010 |
Figure |
2008.11.21 Final Current Conditions Report Figure 6 Watersheds |
Tetra Tech |
2008 |
Figure |
2007.08.10 RFS Plant Survey, Sensitive Plants Figures |
URS |
2007 |
Figure |
2009.07.31 Tsunami Inundation Map for Emergency Planning with Berkeley Global Campus |
Contra Costa County |
2009 |
Figure |
Coastal Prairie Native and Rare Taxa |
The Watershed Project |
2007 |
Figure |
Coastal Prairie Big Meadow 2016 and 2017 Mow Lines |
UC Berkeley |
2017 |
Figure |
2020.02.12 Stege Marsh Ridgway's Rail Sightings |
UC Berkeley |
2020 |
Figure |
Coastal Prairie Big Meadow 2016 and 2017 Mow Lines with Native Richness |
UC Berkeley |
2017 |
Figure |
2018.12 MFA Pilot Excavation Lumex and PDR Location Maps |
Tetra Tech |
2018 |
Figure |
2007 Big Meadow and Northwest Meadow Sensitive Plants |
URS |
2007 |
Figure |
2017.08.10 Map of Corporation Yard Excavation Areas |
Tetra Tech |
2017 |
Figure |
2002.12.09 Conservation Easement, East Bay Regional Park District |
Kier & Wright |
2002 |
Figure |
Habitat Areas with Acreage (Eco-Risk Strategy Map 2009) |
Tetra Tech |
2008 |
Figure |
February 2017 Big Meadow with 2016 Mow Lines and Species Richness |
UC Berkeley |
2017 |
Figure |
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Figure 7 Groundwater Sampling Locations |
Tetra Tech |
2010 |
Figure |
October 2017 Big Meadow Burn Area with 2017 Mow Lines |
UC Berkeley |
2017 |
Figure |
2007.10.02 TCRA Air Monitoring PDR Location Map |
UC Berkeley |
2007 |
Figure |
October 2017 Big Meadow Burn Area with 2017 Mow Lines and Richness |
UC Berkeley |
2017 |
Figure |
2007.10.03 TCRA Air Monitoring PDR Location Map |
UC Berkeley |
2007 |
Figure |
2003.04.15 Phase 2 Remedial Action Plan, Table 2 |
URS |
2003 |
Figure |
2007.10.04 TCRA Air Monitoring PDR Location Map |
UC Berkeley |
2007 |
Figure |
2017.01.05 Figure 3 Marsh Area Ownership |
Tetra Tech |
2017 |
Figure |
2003.07.16 Project and Environmental Approval for the Richmond Field Station Remediation Project Figure |
UC Berkeley |
2003 |
Figure |