Publications

Titlesort descending Author Year Publication type
2013.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.09.16 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.10.10 Final 2013 Groundwater Sampling Results Technical Memorandum Tetra Tech 2013 Report
2013.10.11 Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Response to Comments Terraphase 2013 Report
2013.10.11 Response to Department of Toxic Substances Control Comments Regarding the “Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station” Terraphase 2013 Report
2013.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.10.16 Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Approval Letter DTSC 2013 Agency Letter
2013.10.30 Final 2013 Groundwater Sampling Results Technical Memorandum Approval Letter DTSC 2013 Agency Letter
2013.11 Richmond Field Station Floral Compendium (November 2013 Update) UC Berkeley 2013 Report
2013.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.11.25 Public Draft Removal Action Workplan Tetra Tech 2013 Report
2013.12.05 Public Draft Removal Action Workplan Presentation UC Berkeley 2013 Presentation
2013.12.06 Operations and Maintenance Plan, East Stege Marsh Arcadis 2013 Report
2013.12.16 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2014.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.01.31 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2013, Campus Bay Terraphase 2014 Report
2014.02.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.03.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.04.11 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 27, 2014 Sampling Event Tetra Tech 2014 Report
2014.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.04.16 Final Richmond Bay Campus Coastal Terrace Prairie Management Plan Mark Stromberg 2014 Report
2014.04.24 Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier Terraphase 2014 Report
2014.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.06.16 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.07.18 Final Removal Action Workplan, Approval Letter DTSC 2014 Agency Letter
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site Tetra Tech 2014 Report
2014.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.09.19 Response to Department of Toxic Substances Control Comments Regarding the “Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, University of California, Richmond F Terraphase 2014 Report
2014.09.25 Draft Phase IV Field Sampling Plan, Comment Letter DTSC 2014 Agency Letter
2014.10.06 Final Phase IV Field Sampling Plan Tetra Tech 2014 Report
2014.10.08 PEERpipevalve Form A UC Berkeley; Tetra Tech 2014 Report
2014.10.10 Building 280A and Building 450 Soil Sampling UC Berkeley 2014 Report
2014.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter DTSC 2014 Agency Letter
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter DTSC 2014 Agency Letter
2014.10.24 LBNL SEISMIC Form A UC Berkeley 2014 Report
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC Tetra Tech 2014 Report
2014.10.28 Final Phase IV Field Sampling Plan Addendum 1 Tetra Tech 2014 Report
2014.10.29 Bulb Exploratory Excavation Downwind Personal Data Real-time Aerosol Monitor UC Berkeley 2014 Air Monitoring Data
2014.10.29 Bulb Exploratory Excavation Upwind Personal Data Real-time Aerosol Monitor UC Berkeley 2014 Air Monitoring Data
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC UC Berkeley 2014 Report
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter DTSC 2014 Agency Letter
2014.11.03 PEERfootings Form A and July 18, 2014 Soil Sampling Letter to DTSC UC Berkeley; Tetra Tech 2014 Report
2014.11.13 Final Pre-Design Investigation Report for Habitat Area 2, Campus Bay Site Arcadis 2014 Report
2014.11.13 LBNL SEISMIC DTSC approval DTSC 2014 Agency Letter
2014.11.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum Tetra Tech 2014 Report
2014.12.01 LBNL SEISMIC Form B UC Berkeley 2014 Report