2013.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.09.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.10.10 Final 2013 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2013 |
Report |
2013.10.11 Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Response to Comments |
Terraphase |
2013 |
Report |
2013.10.11 Response to Department of Toxic Substances Control Comments Regarding the “Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station” |
Terraphase |
2013 |
Report |
2013.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.10.16 Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Approval Letter |
DTSC |
2013 |
Agency Letter |
2013.10.30 Final 2013 Groundwater Sampling Results Technical Memorandum Approval Letter |
DTSC |
2013 |
Agency Letter |
2013.11 Richmond Field Station Floral Compendium (November 2013 Update) |
UC Berkeley |
2013 |
Report |
2013.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.11.25 Public Draft Removal Action Workplan |
Tetra Tech |
2013 |
Report |
2013.12.05 Public Draft Removal Action Workplan Presentation |
UC Berkeley |
2013 |
Presentation |
2013.12.06 Operations and Maintenance Plan, East Stege Marsh |
Arcadis |
2013 |
Report |
2013.12.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2014.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.01.31 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2013, Campus Bay |
Terraphase |
2014 |
Report |
2014.02.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.03.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.04.11 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 27, 2014 Sampling Event |
Tetra Tech |
2014 |
Report |
2014.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.04.16 Final Richmond Bay Campus Coastal Terrace Prairie Management Plan |
Mark Stromberg |
2014 |
Report |
2014.04.24 Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier |
Terraphase |
2014 |
Report |
2014.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.06.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.07.18 Final Removal Action Workplan, Approval Letter |
DTSC |
2014 |
Agency Letter |
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site |
Tetra Tech |
2014 |
Report |
2014.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.09.19 Response to Department of Toxic Substances Control Comments Regarding the “Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, University of California, Richmond F |
Terraphase |
2014 |
Report |
2014.09.25 Draft Phase IV Field Sampling Plan, Comment Letter |
DTSC |
2014 |
Agency Letter |
2014.10.06 Final Phase IV Field Sampling Plan |
Tetra Tech |
2014 |
Report |
2014.10.08 PEERpipevalve Form A |
UC Berkeley; Tetra Tech |
2014 |
Report |
2014.10.10 Building 280A and Building 450 Soil Sampling |
UC Berkeley |
2014 |
Report |
2014.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter |
DTSC |
2014 |
Agency Letter |
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter |
DTSC |
2014 |
Agency Letter |
2014.10.24 LBNL SEISMIC Form A |
UC Berkeley |
2014 |
Report |
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC |
Tetra Tech |
2014 |
Report |
2014.10.28 Final Phase IV Field Sampling Plan Addendum 1 |
Tetra Tech |
2014 |
Report |
2014.10.29 Bulb Exploratory Excavation Downwind Personal Data Real-time Aerosol Monitor |
UC Berkeley |
2014 |
Air Monitoring Data |
2014.10.29 Bulb Exploratory Excavation Upwind Personal Data Real-time Aerosol Monitor |
UC Berkeley |
2014 |
Air Monitoring Data |
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC |
UC Berkeley |
2014 |
Report |
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter |
DTSC |
2014 |
Agency Letter |
2014.11.03 PEERfootings Form A and July 18, 2014 Soil Sampling Letter to DTSC |
UC Berkeley; Tetra Tech |
2014 |
Report |
2014.11.13 Final Pre-Design Investigation Report for Habitat Area 2, Campus Bay Site |
Arcadis |
2014 |
Report |
2014.11.13 LBNL SEISMIC DTSC approval |
DTSC |
2014 |
Agency Letter |
2014.11.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2014 |
Report |
2014.12.01 LBNL SEISMIC Form B |
UC Berkeley |
2014 |
Report |