2006.11.02 Field Implementation Plan for Surface Water, Stormwater and Sediment Monitoring |
Tetra Tech |
2006 |
Report |
2016.01.14 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2012.09.05 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2017.03.24 Proposed Continued Groundwater Monitoring Locations for 2017 |
Tetra Tech |
2017 |
Report |
2007.03.30 Work Plan for Additional Groundwater Investigation and Piezometer Installation, Updated Table 1 |
LFR |
2007 |
Report |
2022.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2008.11.21 (3) Final Current Conditions Report Appendices A, B, D, E, F, G, H, I, K & L |
Tetra Tech |
2008 |
Report |
2017.07.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2006.02.07 Background Air Monitoring at Building 478 Attachments A-C |
UC Berkeley |
2006 |
Report |
2009.03.19 Year 3 Monitoring Report for the Western Stege Marsh Restoration Project |
Tetra Tech |
2009 |
Report |
2018.10.15 Final Phase V Sampling Results Technical Memorandum Western Stege Marsh |
Tetra Tech |
2018 |
Report |
2005.11.30 Soil Vapor Study Results for Building 240 at the Zeneca/former Stauffer Chemical Site |
DTSC |
2005 |
Report |
2012.04.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2013.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2015.02.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2011.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2015.10.06 Phase IV, EPA Meadow North, Supplementary PCB Sampling Results |
Tetra Tech |
2015 |
Report |
2018.05.21 Annual Groundwater and Surface Water Monitoring Report, January 1 Through December 31, 2017, Campus Bay, Response to Comments |
Terraphase |
2018 |
Report |
2020.07.14 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2022.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
Coastal Prairie mow guidelines and maps |
UC Berkeley |
2008 |
Report |
2004.11.22 Status Report on Polychlorinated Biphenyls in the Western Storm Drain |
UC Berkeley |
2004 |
Report |
2001.11.13 Evaluation of the Zeneca Richmond Facility as Salt Marsh Harvest Mouse Habitat |
H.T. Harvey & Associates |
2001 |
Report |
2017.07.20 Botanical Survey Report, Northern Regional Library Facility, Phase IV |
Rana Creek Habitat Restoration |
2017 |
Report |
2012.02.29 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2019.09.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2008.03.14 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |
2009.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2016.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2005.06.03 Draft Conceptual Remedial Action Plan - Addendum |
BBL |
2005 |
Report |
2017.09.15 Draft 2017 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2017 |
Report |
2020.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2021.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2023.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2019.08.02 Draft 2019 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2019 |
Report |
2018.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2016.06.03 TSRCB445 Forms A and B for kiosk installation |
UC Berkeley |
2016 |
Report |
2013.10.11 Response to Department of Toxic Substances Control Comments Regarding the “Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station” |
Terraphase |
2013 |
Report |
2015.06.26 RFS Corporation Yard Removal Action Specifications |
Tetra Tech |
2015 |
Report |
2012.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2008.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |
2014.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2016.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2012.06.11 Technical Memorandum for Well Closures |
Tetra Tech |
2012 |
Report |
2010.11.24 Letter Work Plan to Evaluate Groundwater in Select Areas at the University of California Richmond Field Station, Response to Comments |
Arcadis |
2010 |
Report |
2017.07.13 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2017 |
Report |
2012.07.19 Revised TCE Risk Evaluation, Response to Comments |
Terraphase |
2012 |
Report |
2013.12.06 Operations and Maintenance Plan, East Stege Marsh |
Arcadis |
2013 |
Report |
2020.11.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2022.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |