2012.03.15 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.03.16 Proposed Continued Groundwater Monitoring, April 2012 |
Tetra Tech |
2012 |
Report |
2012.03.20 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.03.23 Technical Memorandum for Well Closures, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.04.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.04.26 Phase II Sampling Results Technical Memorandum, Draft Response to Comments |
UC Berkeley |
2012 |
Report |
2012.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.05.21 Phase III Field Sampling Plan, Response to Comments |
UC Berkeley |
2012 |
Report |
2012.06.01 Phase II Sampling Results Technical Memorandum, RTC Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.06.11 Final Phase II Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.06.11 Technical Memorandum for Well Closures |
Tetra Tech |
2012 |
Report |
2012.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.06.22 Phase III Field Sampling Plan, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.07.05 Technical Memorandum for Well Closures, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.07.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.07.19 Revised TCE Risk Evaluation, Response to Comments |
Terraphase |
2012 |
Report |
2012.08.03 Phase III Field Sampling Plan, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.08.10 Final Phase III Field Sampling Plan |
Tetra Tech |
2012 |
Report |
2012.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.09.05 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.09.10 Pilot Study Summary Report for the In Situ Treatment of Volatile Organic Compounds in Groundwater, 2011 Injections |
Arcadis |
2012 |
Report |
2012.09.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.10.04 Revised TCE Risk Evaluation, DTSC Approval |
DTSC |
2012 |
Agency Letter |
2012.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.10.23 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.10. 25 Conservation of the Remnant Coastal Prairie at UC Berkeley's Richmond Field Station |
Alan Cai; Patrick Donnelly-Shores |
2012 |
Report |
2012.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.11.16 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Response to Comments |
Terraphase |
2012 |
Report |
2012.11.21 Sampling Results for Soil Samples Collected for the Building 445 Landscaping Project |
Tetra Tech |
2012 |
Report |
2012.12.04 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.12.12 Final Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.12.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.12.18 Draft Groundwater Investigation Within and in the Vicinity of the BAPB at the Richmond Field Station |
Terraphase |
2012 |
Report |
2013.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.02.01 Final Technical Approach for Human Health Risk Assessment, Site Characterization Report, Proposed Richmond Bay Campus |
Tetra Tech |
2013 |
Report |
2013.02.01 RFS Natural Areas Restoration: Western Stege Marsh, Coastal Terrace Prairie |
UC Berkeley |
2013 |
Presentation |
2013.02.14 Draft Site Characterization Report, Proposed Richmond Bay Campus, Comment Letter |
DTSC |
2013 |
Agency Letter |
2013.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.03.01 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 4, 2013 Sampling Event |
Tetra Tech |
2013 |
Report |
2013.03.05 Notification of Piezometer Abandonment and Installation |
Tetra Tech |
2013 |
Report |
2013.03.08 Notification of Piezometer Abandonment and Installation, and Scope of Work, Approval Letter |
DTSC |
2013 |
Agency Letter |
2013.03.08 Notification of Piezometer Abandonment and Installation, and Scope of Work, Approval Letter |
DTSC |
2013 |
Agency Letter |
2013.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.04.17 Final Richmond Field Station Grassland Constraints Analysis |
Wildlife Research Associates; Jane Valerius Environmental Consulting |
2013 |
Report |
2013.05.02 Site Characterization Report Approval Letter |
DTSC |
2013 |
Agency Letter |
2013.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2013.05.20 Draft Groundwater Investigation Within and In the Vicinity of the BAPB at the Richmond Field Station, Comment Letter |
DTSC |
2013 |
Agency Letter |
2013.05.28 Final Site Characterization Report |
Tetra Tech |
2013 |
Report |