Publications

Title Author Year Publication type
2019.09.16 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.08.29 Corporation Yard, Data Gap Sampling Approach, Revised Tetra Tech 2019 Technical Letter
2019.08.28 Corporation Yard Data Gap Sampling Approach DTSC Approval Letter DTSC 2019 Agency Letter
2019.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.08.02 Draft 2019 Groundwater Sampling Results Technical Memorandum Letter Tetra Tech 2019 Transmittal Letter
2019.08.02 Draft 2019 Groundwater Sampling Results Technical Memorandum Tetra Tech 2019 Report
2019.08.01 Northwest Meadow Sampling Closure Letter UC Berkeley 2019 Transmittal Letter
2019.07.31 Semi-Annual Groundwater and Surface Water Monitoring Report, January 1 through June 30, 2019, Campus Bay Terraphase 2019 Report
2019.07.29 Corporation Yard, Data Gap Sampling Approach Tetra Tech 2019 Technical Letter
2019.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.06.25 Revised Mercury Fulminate Area Excavation Pilot Study Summary Tetra Tech 2019 Report
2019.06.17 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.06.10 NRLF Phase 4 Updated Sampling Report Tetra Tech 2019 Report
2019.06.03.UC Berkeley Richmond Field Station Mercury Area Pilot Study DTSC Conditional Approval Letter DTSC 2019 Agency Letter
2019.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.05.06 Mercury Fulminate Area Pilot Excavation Summary Tetra Tech 2019 Report
2019.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.04.11 DTSC Update Richmond Southeast Shoreline Sites DTSC 2019 Report
2019.04.04 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C - DTSC Comment Letter 2019 Agency Letter
2019.04.03 Final 2018 Groundwater Sampling Results Technical Memo - Transmittal Letter UC Berkeley 2019 Transmittal Letter
2019.03.21 Sampling Results for Western Stege Marsh Near-Surface Sediment Sample January 25, 2019 UC Berkeley 2019 Technical Letter
2019.03.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.03.04 Richmond Field Station Draft 2018 Groundwater Sampling Tech Memo DTSC Conditional Approval DTSC 2019 Agency Letter
2019.03.29 Final 2018 Groundwater Sampling Results Technical Memo Tetra Tech 2019 Report
2019.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report