Publications

Title Author Year Publication type
2008.04.09 FPL Time Critical Removal Action Summary Report, Approval Letter DTSC 2008 Agency Letter
2020.06.17 Corporation Yard, Triplicates Sampling Approach, Comment Letter DTSC 2020 Agency Letter
2023.02.06 Approval of Corporation Yard, Triplicates Sample Results DTSC 2023 Agency Letter
2019.11.25 NRLF Bioretention Area Sampling Approach, DTSC Comment Letter DTSC 2019 Agency Letter
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter DTSC 2012 Agency Letter
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter DTSC 2014 Agency Letter
2022.08.18 2021 Sampling Results Technical Memorandum Approval DTSC 2022 Agency Letter
2019.08.02 Draft 2019 Groundwater Sampling Results Technical Memorandum Letter Tetra Tech 2019 Transmittal Letter
2008.01.08 Year 2 Monitoring Report Western Stege Marsh Restoration Program Transmittal Letter Tetra Tech 2008 Transmittal Letter
2019.11.07 Draft 2019 Groundwater Sampling Results Technical Memorandum, Appendix E Transmittal Letter UC Berkeley 2019 Transmittal Letter
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum, Transmittal Letter Tetra Tech 2015 Transmittal Letter
2003.07.25 Biological Assessment Cover Letter BBL 2003 Transmittal Letter
2016.09.27 Draft Soil Management Plan, Revision 1 Transmittal Letter Tetra Tech 2016 Transmittal Letter
2008.11.21 (6) Final CCR Submittal Cover Letter UC Berkeley 2008 Transmittal Letter
2015.01.26 BCDC Permit Revision Number 3 Cover Letter BCDC 2015 Transmittal Letter
2017.01.09 Final 2016 Groundwater Sampling Results Technical Memorandum Cover Letter Tetra Tech 2017 Transmittal Letter
2016.07.15 Draft Phase V Field Sampling Plan, Transmittal Letter Tetra Tech 2016 Transmittal Letter
2009.02.27 Draft Field Sampling Workplan Cover Letter UC Berkeley 2009 Transmittal Letter
2019.04.03 Final 2018 Groundwater Sampling Results Technical Memo - Transmittal Letter UC Berkeley 2019 Transmittal Letter
2018.10.15 Final Phase V Sampling Results Technical Memorandum Western Stege Marsh, Transmittal Letter UC Berkeley 2018 Transmittal Letter
2022.07.23 Final EPA North Meadow PCB Cleanup and Removal Action Implementation Report Transmittal Letter UC Berkeley 2022 Transmittal Letter
2019.08.01 Northwest Meadow Sampling Closure Letter UC Berkeley 2019 Transmittal Letter
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum Tetra Tech 2015 Transmittal Letter
2017.01.05 Final Phase V Field Sampling Plan Cover Letter Tetra Tech 2017 Transmittal Letter
2018.11.02 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C Transmittal Letter Tetra Tech 2018 Transmittal Letter