Publications

Title Author Year Publication type
2007.08.10 Botanical Survey Report URS 2007 Report
2006.01.10 Special Update Meeker Beach Exploratory Investigation Completed DTSC 2006 Report
2007.08.24 Final Memorandum for a Time-Critical Removal Action at the Former Forest Products Laboratory Wood Treatment Laboratory Tetra Tech 2007 Report
2007.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2014.02.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2016.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2016 Report
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum Tetra Tech 2015 Report
2007.07.23 Technical Memorandum: Background Concentrations of Arsenic in Soil at Campus Bay Erler & Kalinowski, Inc. 2007 Report
2009.02.23 Implementation Summary Report for a Time- Critical Removal Action at Two Campfire Locations in the Western Transition Area Tetra Tech 2009 Report
2008.03.14 Implementation Summary Report for a Time-Critical Removal Action at the Former Forest Products Wood Treatment Laboratory Tetra Tech 2008 Report
2016.03.21 Proposed Continued Groundwater Monitoring Locations for 2016 Tetra Tech 2016 Report
2022.08.22 Draft B112 Transformer Area PCB Cleanup and Removal Action Implementation Summary Report Tetra Tech 2022 Report
2023.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2023 Report
2019.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2004.01.30 Invasive/Exotic Vegetation Management Plan BBL 2004 Report
2017.04.12 Final Soil Management Plan, Revision 1, Removal Action Workplan, Attachment C Tetra Tech 2017 Report
2013.05.28 Final Site Characterization Report Tetra Tech 2013 Report
2011.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2008.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2013.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2010.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 1: Year 5 Hydrologic Monitoring Report Kamman Hydrology & Engineering, Inc 2010 Report
2012.12.06 East Stege Marsh Operations and Maintenance Plan Arcadis 2013 Report
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum Tetra Tech 2014 Report