Publications

Titlesort ascending Author Year Publication type
2019.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.05.06 Mercury Fulminate Area Pilot Excavation Summary Tetra Tech 2019 Report
2019.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.04.11 DTSC Update Richmond Southeast Shoreline Sites DTSC 2019 Report
2019.04.04 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C - DTSC Comment Letter 2019 Agency Letter
2019.04.03 Final 2018 Groundwater Sampling Results Technical Memo - Transmittal Letter UC Berkeley 2019 Transmittal Letter
2019.03.29 Final 2018 Groundwater Sampling Results Technical Memo Tetra Tech 2019 Report
2019.03.21 Sampling Results for Western Stege Marsh Near-Surface Sediment Sample January 25, 2019 UC Berkeley 2019 Technical Letter
2019.03.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.03.04 Richmond Field Station Draft 2018 Groundwater Sampling Tech Memo DTSC Conditional Approval DTSC 2019 Agency Letter
2019.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.01.31 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2018, Campus Bay Terraphase 2019 Report
2019.01.31 2018 Campus Bay Annual Groundwater and Surface Water Monitoring Report Appendicies Terraphase 2019 Report
2019.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2018.12.17 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2018.12.03 NRLF DTSC Results Comments DTSC 2018 Agency Letter
2018.12 MFA Pilot Excavation Lumex and PDR Location Maps Tetra Tech 2018 Figure
2018.12 MFA Pilot Excavation Air Monitoring Data Tetra Tech 2018 Air Monitoring Data
2018.11.18 Draft 2014 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2014 Agency Letter
2018.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2018.11.02 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C Transmittal Letter Tetra Tech 2018 Transmittal Letter
2018.11.02 Draft Soil Management Plan, Revision 2 Removal Action Workplan, Attachment C Tetra Tech 2018 Report
2018.10.31 Corporation Yard, Building 120 Concrete Sampling Summary Tetra Tech 2018 Report
2018.10.25 Draft 2018 Groundwater Sampling Results Technical Memorandum, Response to Comments UC Berkeley 2018 Report
2018.10.25 Draft 2018 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2018 Agency Letter