1992.08.24 Richmond Field Station Lepidoptera Survey, Revised |
Jerry A. Powell |
1992 |
Report |
2007.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2013.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2010.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 1: Year 5 Hydrologic Monitoring Report |
Kamman Hydrology & Engineering, Inc |
2010 |
Report |
2012.12.06 East Stege Marsh Operations and Maintenance Plan |
Arcadis |
2013 |
Report |
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2014 |
Report |
2002.08.16 Final Remedial Design Details - Addendum |
URS |
2002 |
Report |
2008.03.18 Sampling Results for Surface Soil in the Pampas Grass Area near Building 201 |
Tetra Tech |
2008 |
Report |
2017.10.25 EPA North Meadow Field Sampling Plan |
UC Berkeley |
2017 |
Report |
2020.03.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2021.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2022.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2017.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2018.03.14 Final 2017 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2018 |
Report |
2006.01.18 Provisional Joint Health Statement Summary The Zeneca and UC Richmond Field Station Sites |
Contra Costa County Health Services Department; California Department of Health Services |
2006 |
Report |
2011.05.11 Final Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2004.02.14 West Stege Marsh Upland Revegetation Plan (2003-5) |
The Aquatic Outreach Institute |
2004 |
Report |
2012.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2013.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2015.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2011.05.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2008.02.13 Sampling Results for Western Transition Area Surface Soil Samples |
Tetra Tech |
2008 |
Report |
2014.10.10 Building 280A and Building 450 Soil Sampling |
UC Berkeley |
2014 |
Report |
2001.11.21 Final Results of Additional Soil and Groundwater Investigations and Surface Water Monitoring Plan, Marsh Portions of Subunit 2A |
URS |
2001 |
Report |
2011.11.18 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results |
Terraphase |
2011 |
Report |
2012.03.16 Proposed Continued Groundwater Monitoring, April 2012 |
Tetra Tech |
2012 |
Report |
2013.03.05 Notification of Piezometer Abandonment and Installation |
Tetra Tech |
2013 |
Report |
2020.08.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2015.12.11 Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum |
Tetra Tech |
2015 |
Report |
2019.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
1941.06.30 East Bay Cityies Sewage Disposal Survey Report Upon the Collection, Treatement, and Disposal of Sewage and Industrial Wastes of the East Bay Cities, California |
The Board of Consuliting Engineers |
1941 |
Report |
2017.01.09 Final 2016 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2017 |
Report |
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site |
Tetra Tech |
2014 |
Report |
2006.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2006 |
Report |
2012.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2009.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2016.05.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2011.03.11 Transmittal of Groundwater Data Collected in Select Areas at the University of California Richmond Field Station |
Arcadis |
2011 |
Report |
2018.02.13 2017 Groundwater Sampling Results Technical Memorandum, Response to Comments |
UC Berkeley |
2018 |
Report |
2018.10.25 Draft 2018 Groundwater Sampling Results Technical Memorandum, Response to Comments |
UC Berkeley |
2018 |
Report |
2020.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2023.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2019.05.06 Mercury Fulminate Area Pilot Excavation Summary |
Tetra Tech |
2019 |
Report |
2018.01.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2015.02.20 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site |
Tetra Tech |
2015 |
Report |
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC |
UC Berkeley |
2014 |
Report |
2010.04.15 Final Phase I Groundwater Sampling Field Sampling Workplan |
Tetra Tech |
2010 |
Report |
2010.02.26 Letter Work Plan for Step-Out Sampling Locations on the University Of California Richmond Field Station, MW-25 Pilot Test Area, Lots 1 and 2, Former Zeneca Facility |
LFR |
2010 |
Report |