Publications

Title Author Year Publication typesort descending
2021.04.28. Stege Marsh Rail Survey.DTSC Approval Letter (incl ME memo) DTSC 2021 Agency Letter
2023.01.24 Notification of Piezometer DHR, Abandonment Approval Letter DTSC 2023 Agency Letter
2005.09.29 DTSC letter DTSC 2005 Agency Letter
2012.03.14 Phase II Sampling Results Technical Memorandum, DTSC Comment Letter DTSC 2012 Agency Letter
2008.12.29 Final Current Conditions Report, Approval Letter DTSC 2008 Agency Letter
2007.09.17 Time Critical Removal Action at the Former FPL, Notice of Exemption DTSC 2007 Agency Letter
2023.04.12 Review of Draft Soil Management Plan, Revision 3 DTSC 2023 Agency Letter
2017.05.24 Sub-Slab Vapor Monitoring, Building 478 DTSC Approval Letter DTSC 2017 Agency Letter
2019.09.23 Draft 2019 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2019 Agency Letter
2016.12.09 Draft Phase V Field Sampling Plan DTSC Comment Letter DTSC 2016 Agency Letter
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter DTSC 2014 Agency Letter
2015.08.14 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation, Approval Letter DTSC 2015 Agency Letter
2007.10.23 Back fill approval for FPL Time Critical Removal Action DTSC 2007 Agency Letter
2021.04.28.Groundwater Sampling.DTSC Approval Letter DTSC 2021 Agency Letter
2007.06.29 DTSC Summary of Violations DTSC 2007 Agency Letter
2011.03.29 Proposed Continued Groundwater Monitoring Locations DTSC Approval Letter DTSC 2011 Agency Letter
2010.11.19 Year 5 Monitoring Report, DTSC Comments DTSC 2010 Agency Letter
2017.12.15 Draft 2017 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2017 Agency Letter
2007.10.01 Technical Memorandum: Background Conditions of Arsenic in Soil at Campus Bay, Approval Letter DTSC 2007 Agency Letter
2019.12.30 Draft 2019 Groundwater Sampling Results Technical Memorandum, DTSC Approval Letter DTSC 2019 Agency Letter
2019.11.25 NRLF Summary Results DTSC No Comment Letter DTSC 2019 Agency Letter
2009.04.23 Implementation Summary Report for a Time-Critical Removal Action at Two Campfire Locations in the Western Transition Area, Comment Letter DTSC 2009 Agency Letter
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter DTSC 2014 Agency Letter
2015.12.29 FINAL Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum DTSC Approval Letter DTSC 2015 Agency Letter
2009.05.29 Implementation Summary Report for a Time-Critical Removal Action at Two Subareas in the Western Transition Area Approval Letter DTSC 2009 Agency Letter
2012.08.03 Phase III Field Sampling Plan, Approval Letter DTSC 2012 Agency Letter
2008.04.09 FPL Time Critical Removal Action Summary Report, Approval Letter DTSC 2008 Agency Letter
2020.06.17 Corporation Yard, Triplicates Sampling Approach, Comment Letter DTSC 2020 Agency Letter
2023.02.03 Approval of Corporation Yard: East Meadow and Building 120 Area DTSC 2023 Agency Letter
2022.07.27 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples Approval DTSC 2022 Agency Letter
2019.11.25 NRLF Bioretention Area Sampling Approach, DTSC Comment Letter DTSC 2019 Agency Letter
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter DTSC 2012 Agency Letter
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter DTSC 2014 Agency Letter
2018.08.17 Revised Corporation Yard, Building 120 Concrete Sampling Approach, Approval Letter DTSC 2018 Agency Letter
2012.06.01 Phase II Sampling Results Technical Memorandum, RTC Approval Letter DTSC 2012 Agency Letter
2020.06.16 Corporation Yard, Triplicates Sampling Approach, HERO Comment Letter DTSC 2020 Agency Letter
2023.02.06 Approval of Corporation Yard, Triplicates Sample Results DTSC 2023 Agency Letter
2007.09.17 Final Memorandum for a Time-Critical Removal Action (TCRA) at the Former Forest Products Laboratory Wood Treatment Laboratory, Approval Letter DTSC 2007 Agency Letter
2018.04.03 Phase IV, EPA North Meadow, Supplementary PCB Sampling Results DTSC Comment Letter DTSC 2018 Agency Letter
2020.09.28 B280 Trench Project, DTSC Comment Letter DTSC 2020 Agency Letter
2022.08.18 2021 Sampling Results Technical Memorandum Approval DTSC 2022 Agency Letter
2012.02.07 Draft Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2018.11.18 Draft 2014 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2014 Agency Letter
2020.03.13 NRLF Bioretention Area Sampling Approach, Approval Letter DTSC 2020 Agency Letter
2020.12.18 Western Transition Area DTSC Comment Letter DTSC 2020 Agency Letter
2015.01.15 Response to Comments for "Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier" DTSC Approval Letter DTSC 2015 Agency Letter
2017.12.21 Draft Phase V Sampling Results Technical Memorandum Western Stege Marsh, DTSC Comment Letter DTSC 2017 Agency Letter
2013.10.16 Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Approval Letter DTSC 2013 Agency Letter
2018.10.22 Mercury Fulminate Area Excavation Pilot Study, Approval Letter DTSC 2018 Agency Letter
2007.09.21 Soil Confirmation and Perimeter Air Monitoring Plan for FPL Time Critical Removal Action, Approval Letter DTSC 2007 Agency Letter