2008.11.21 (4) Final Current Conditions Report Appendix C - Photographs |
Tetra Tech |
2008 |
Report |
2017.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2007.12.12 Richmond Field Station Air Quality Sampling and Analysis Plan |
Tetra Tech |
2007 |
Report |
2007.11.15 Year 2 Monitoring Report Western Stege Marsh Restoration Program |
Tetra Tech; Sea Engineering, Inc |
2007 |
Report |
2006.01.04 DTSC Status Report Update South Richmond Shoreline Sites |
DTSC |
2006 |
Report |
2007.07.15 Draft Public Health Assessment of Richmond Field Station for Public Comment |
Department of Public Health |
2007 |
Report |
2011.01.12 Draft Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2009.06.04 RFS Weeds Worker Training Manual |
UC Berkeley |
2009 |
Report |
2007.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2009.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2015.03.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2011.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2009.08.12 Year 4 Monitoring Report for the Western Stege Marsh Restoration Project |
Tetra Tech |
2009 |
Report |
2018.08.15 2017/2018 Annual Groundwater Sampling |
Tetra Tech |
2018 |
Report |
2019.11.07 Draft 2019 Groundwater Sampling Results Technical Memorandum, Appendix E |
Tetra Tech |
2019 |
Report |
2014.11.13 Final Pre-Design Investigation Report for Habitat Area 2, Campus Bay Site |
Arcadis |
2014 |
Report |
2019.12.31 DRAFT Removal Action Workplan Research, Education, and Support Area and Groundwater Five-Year Review |
Tetra Tech |
2019 |
Report |
2019.01.31 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2018, Campus Bay |
Terraphase |
2019 |
Report |
2021.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2019.12.31 Final Soil Management Plan, Revision 2 |
Tetra Tech |
2019 |
Report |
2019.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2003.07.25 Richmond Field Station Remediation Project Biological Assessment Report |
BBL |
2003 |
Report |
2004.12.03 Groundwater, Surface Water, and Sediment Monitoring Plan, Subunit 2, Meade Street Operable Unit |
BBL |
2004 |
Report |
2002.06.05 Letter to USFWS, Section 7 Consultation Supplemental Information |
URS |
2002 |
Report |
2013.11 Richmond Field Station Floral Compendium (November 2013 Update) |
UC Berkeley |
2013 |
Report |
2009.11.02 Results of Evaluation of Pre-Construction Conditions in Soil, Meade By-pass Roadway |
PES Environmental, Inc |
2009 |
Report |
1990.04.06 Environmental Assessment for the Proposed EPA Region 9 Laboratory at the University of California's Richmond Field Station |
Jones & Stokes Associates, Inc |
1990 |
Report |
2008.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |
2014.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2016.02.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2002.12.17 Final Conceptual Remedial Action Plan |
BBL |
2002 |
Report |
2016.09.27 Draft Soil Management Plan, Revision 1 |
Tetra Tech |
2016 |
Report |
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2018.10.31 Corporation Yard, Building 120 Concrete Sampling Summary |
Tetra Tech |
2018 |
Report |
2007.03.30 Work Plan for Additional Groundwater Investigation and Piezometer Installation, Campus Bay |
LFR |
2007 |
Report |
2020.09.30 RFS MFA DRAFT Removal Action Completion Report |
Tetra Tech |
2020 |
Report |
2021.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2023.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2018.04.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2016.03.24 B163PHYTOREM Forms and B including sampling results and Work Plan |
UC Berkeley |
2016 |
Report |
2015.10.19 Final 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2014.09.19 Response to Department of Toxic Substances Control Comments Regarding the “Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, University of California, Richmond F |
Terraphase |
2014 |
Report |
2009.05.26 Sampling Results for Stormwater within the Western Stege Marsh |
Tetra Tech |
2009 |
Report |
2016.05.16 Final Phase IV Sampling Results Technical Memorandum (no appendices) |
Tetra Tech |
2016 |
Report |
2007.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2013.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2010.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2016.04.14 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.03.10 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |