Publications

Title Author Year Publication type
2014.07.18 Final Removal Action Workplan, Approval Letter DTSC 2014 Agency Letter
2014.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.06.16 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.04.24 Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier Terraphase 2014 Report
2014.04.16 Final Richmond Bay Campus Coastal Terrace Prairie Management Plan Mark Stromberg 2014 Report
2014.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.04.11 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 27, 2014 Sampling Event Tetra Tech 2014 Report
2014.03.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.02.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.01.31 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2013, Campus Bay Terraphase 2014 Report
2014.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2013.12.16 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.12.06 Operations and Maintenance Plan, East Stege Marsh Arcadis 2013 Report
2012.12.06 East Stege Marsh Operations and Maintenance Plan Arcadis 2013 Report
2013.12.05 Public Draft Removal Action Workplan Presentation UC Berkeley 2013 Presentation
2013.11.25 Public Draft Removal Action Workplan Tetra Tech 2013 Report
2013.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.11 Richmond Field Station Floral Compendium (November 2013 Update) UC Berkeley 2013 Report
2013.10.30 Final 2013 Groundwater Sampling Results Technical Memorandum Approval Letter DTSC 2013 Agency Letter
2013.10.16 Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Approval Letter DTSC 2013 Agency Letter
2013.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2013.10.11 Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station, Response to Comments Terraphase 2013 Report
2013.10.11 Response to Department of Toxic Substances Control Comments Regarding the “Draft Monitoring Well Installation Work Plan, Area 1, University of California Richmond Field Station” Terraphase 2013 Report
2013.10.10 Final 2013 Groundwater Sampling Results Technical Memorandum Tetra Tech 2013 Report