Publications

Title Author Year Publication type
2018.03.09 Draft 2017 Groundwater Sampling Results Technical Memorandum DTSC Approval Letter DTSC 2018 Agency Letter
2018.02.28 Phase IV, EPA North Meadow, Supplementary PCB Sampling Results Tetra Tech 2018 Technical Letter
2018.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2018.02.13 2017 Groundwater Sampling Results Technical Memorandum, Response to Comments UC Berkeley 2018 Report
2018.02.08 DTSC Update Richmond Southeast Shoreline Sites DTSC 2018 Report
2018.01.16 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2017.12.21 Draft Phase V Sampling Results Technical Memorandum Western Stege Marsh, DTSC Comment Letter DTSC 2017 Agency Letter
2017.12.17 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2017.12.15 Draft 2017 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2017 Agency Letter
2017.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
October 2017 Big Meadow Burn Area with 2017 Mow Lines and Richness UC Berkeley 2017 Figure
October 2017 Big Meadow Burn Area with 2017 Mow Lines UC Berkeley 2017 Figure
2017.10.25 EPA North Meadow Field Sampling Plan UC Berkeley 2017 Report
Coastal Prairie Big Meadow 2016 and 2017 Mow Lines UC Berkeley 2017 Figure
2017.10.16 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2017.09.15 2017 Groundwater Sampling Results Technical Memorandum Response to Comments Tetra Tech 2017 Report
2017.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2017.09.15 Draft 2017 Groundwater Sampling Results Technical Memorandum Tetra Tech 2017 Report
2017.09.01 USEPA Conditional Approval of PCB Clean Up Plan, Corporation Yard and B150 Transformer EPA 2017 Agency Letter
2017.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2017.08.10 Map of Corporation Yard Excavation Areas Tetra Tech 2017 Figure
2017.08.10 TSCA PCB Risk-based Disposal Application: Corporation Yard and B150 Transformer Area UC Berkeley 2017 Report
2017.08.03 Supplemental PCB Sampling Results, Corporation Yard Tetra Tech 2017 Technical Letter
2017.07.27 Draft Phase V Sampling Results Technical Memorandum Western Stege Marsh Tetra Tech 2017 Report
2017.07.20 Botanical Survey Report, Northern Regional Library Facility, Phase IV Rana Creek Habitat Restoration 2017 Report