Publications

Titlesort ascending Author Year Publication type
2019.11.22 Corporation Yard, Data Gap Sampling Results Tetra Tech 2019 Technical Letter
2019.11.21 NRLF Phase 4 Retention Area Form B and Sampling Approach UC Berkeley 2019 Technical Letter
2019.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.11.07 Draft 2019 Groundwater Sampling Results Technical Memorandum, Appendix E Transmittal Letter UC Berkeley 2019 Transmittal Letter
2019.11.07 Draft 2019 Groundwater Sampling Results Technical Memorandum, Appendix E Tetra Tech 2019 Report
2019.10.25 NRLF Phase 4 - Retention Area Form A UC Berkeley 2019 Technical Letter
2019.10.25 Draft Feasibility Study/Remedial Action Plan for Lot 1, Lot 2, and the Upland Portion of Lot 3 Approval Letter DTSC 2019 Agency Letter
2019.10.24 Mercury Fulminate Area Excavation Plan Tetra Tech 2019 Figure
2019.10.21 Mercury Fulminate Area Excavation Update Summary Tetra Tech 2019 Technical Letter
2019.10.14 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.09.23 Draft 2019 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2019 Agency Letter
2019.09.16 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.08.29 Corporation Yard, Data Gap Sampling Approach, Revised Tetra Tech 2019 Technical Letter
2019.08.28 Corporation Yard Data Gap Sampling Approach DTSC Approval Letter DTSC 2019 Agency Letter
2019.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.08.02 Draft 2019 Groundwater Sampling Results Technical Memorandum Letter Tetra Tech 2019 Transmittal Letter
2019.08.02 Draft 2019 Groundwater Sampling Results Technical Memorandum Tetra Tech 2019 Report
2019.08.01 Northwest Meadow Sampling Closure Letter UC Berkeley 2019 Transmittal Letter
2019.07.31 Semi-Annual Groundwater and Surface Water Monitoring Report, January 1 through June 30, 2019, Campus Bay Terraphase 2019 Report
2019.07.29 Corporation Yard, Data Gap Sampling Approach Tetra Tech 2019 Technical Letter
2019.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.06.25 Revised Mercury Fulminate Area Excavation Pilot Study Summary Tetra Tech 2019 Report
2019.06.17 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2019.06.10 NRLF Phase 4 Updated Sampling Report Tetra Tech 2019 Report
2019.06.03.UC Berkeley Richmond Field Station Mercury Area Pilot Study DTSC Conditional Approval Letter DTSC 2019 Agency Letter