Publications

Title Author Year Publication typesort descending
2016.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2016 Report
2016.07.18 Draft Phase V Field Sampling Plan Tetra Tech 2016 Report
2016.02.11 DTSC Update Richmond Southeast Shoreline Sites DTSC 2016 Report
2007.04.05 Amended Work Plan for Additional Grab Groundwater Investigation and Piezometer Installation LFR 2007 Report
2020.12.07 Stege Marsh California Ridgway's Rail 2020 Viability Study Results BioMaAS; Avocet Research Associates 2020 Report
2008.11.21 (1) Final Current Conditions Report Text and Tables Tetra Tech 2008 Report
2017.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2004.09.29 RFS Remediation Project, Phase 3 Monitoring and Notification, MSOU Subunit 2B, Richmond Field Station, Richmond CA URS 2004 Report
2001.11 Human Health and Ecological Tiered Risk Evaluation, University of California, Berkeley, Richmond Field Station/Stege Marsh URS 2001 Report
2014.12.01 LBNL SEISMIC Form B UC Berkeley 2014 Report
2005.10.19 Staff Summary Report Zeneca Inc. and University of California Berkeley, Meade Street Operable Unit Subunit 2 - Rescission of Site Cleanup Requirements Order No. 01-102 San Francisco Regional Water Quality Control Board 2005 Report
2007.10 Habitat Restoration Progress Report The Watershed Project 2007 Report
2007.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2013.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2014.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2010.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2010 Report
2014.01.31 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2013, Campus Bay Terraphase 2014 Report
2003.04.15 Final Remedial Action Plan - Phase 2 URS 2003 Report
2019.12.16 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2011.12.09 Final Phase I April 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2005.08.29 Western Stege Marsh Restoration Project Year 1 Monitoring Report BBL 2005 Report
2017.04.12 Sub‐Slab Vapor Monitoring, Building 478 Technical Memorandum Terraphase 2017 Report
2008.07.28 Draft for Public Comment Public Health Assessment for Evaluation of Exposure to Contaminants from the Zeneca/Campus Bay Site Department of Public Health 2008 Report
2011.08.19 Response to DTSC Comments on the Technical Memorandum for Well Destructions Tetra Tech 2011 Report
2008.03.07 Western Stege Marsh Restoration Project: Vegetation Monitoring Report - 2007 May & Associates, Inc 2008 Report
2008.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2013.12.16 Richmond Field Station Monthly Summary Report UC Berkeley 2013 Report
2015.11.16 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2008.12 Habitat Restoration Progress Report Appendices The Watershed Project 2008 Report
1990.03.22 Preliminary Investigation of Mercury in Soil and Groundwater at Former Mercury Fulminate Facility Jonas & Associates Inc 1990 Report
2020.02.14 Richmond Field Station Monthly Summary Report UC Berkeley 2020 Report
2006.03.08 Well Closure Documentation Report Stellar Environmental Solutions 2006 Report
2021.08.16 Richmond Field Station Monthly Summary Report UC Berkeley 2021 Report
2023.03.03 Draft Soil Management Plan, Revision 3 Tetra Tech 2023 Report
2019.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2019 Report
2018.07.13 Richmond Field Station Monthly Summary Report UC Berkeley 2018 Report
2003.05.28 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act List of Prepares URS 2003 Report
2007.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2007 Report
2008.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2008 Report
2014.06.16 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2016.10.17 Richmond Field Station Monthly Summary Report UC Berkeley 2016 Report
1990.05.21 Draft Environmental Soil Sampling and Analysis Plan for Construction of EPA Laboratory Jonas & Associates Inc 1990 Report
2012.02.01 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB at the University of California Berkeley Richmond Field Station Arcadis 2012 Report
2018.02.08 DTSC Update Richmond Southeast Shoreline Sites DTSC 2018 Report
2012.12.18 Draft Groundwater Investigation Within and in the Vicinity of the BAPB at the Richmond Field Station Terraphase 2012 Report
2018.05.21 Annual Groundwater and Surface Water Monitoring Report, Appendix C: Groundwater Concentration - Versus - Time Graphs Terraphase 2018 Report
2022.02.11 Richmond Field Station Monthly Summary Report UC Berkeley 2022 Report
2008.11.21 (2) Final Current Conditions Report Figures Tetra Tech 2008 Report
2017.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2017 Report
2006.02.07 Background Air Monitoring at Building 478 UC Berkeley 2006 Report