October 2017 Big Meadow Burn Area with 2017 Mow Lines |
UC Berkeley |
2017 |
Figure |
2007.10.02 TCRA Air Monitoring PDR Location Map |
UC Berkeley |
2007 |
Figure |
2013.02.01 RFS Natural Areas Restoration: Western Stege Marsh, Coastal Terrace Prairie |
UC Berkeley |
2013 |
Presentation |
Stege Marsh Ridgway's Rails Presentation |
Office of Environment, Health & Safety |
2015 |
Presentation |
2008.01.16 Richmond Field Station Remediation and Restoration Project Town Hall |
UC Berkeley |
2008 |
Presentation |
2007.05 Control of Harding grass (Phalaris aquatica) at the Richmond Field Station |
Monica W Stafford; Liz Andrews; Stacy Haines |
2007 |
Presentation |
2013.12.05 Public Draft Removal Action Workplan Presentation |
UC Berkeley |
2013 |
Presentation |
2018.04.27 Western Stege Marsh and Meeker Slough, DTSC, RWQCB, and CoR Meeting |
UC Berkeley |
2018 |
Presentation |
2006.06.20 Notice of Invasive Weed Mowing |
UC Berkeley |
2006 |
White Paper |
2016.06.17 Imported Soils Sampling and Analysis Requirements to Assess Contaminant Concentrations |
UC Berkeley |
2016 |
White Paper |
2008.11.21 (2) Final Current Conditions Report Figures |
Tetra Tech |
2008 |
Report |
2017.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2006.02.07 Background Air Monitoring at Building 478 |
UC Berkeley |
2006 |
Report |
2002.11.01 Response to Comments on Human Health and Ecological Risk Assessment, letter to RWQCB |
URS |
2002 |
Report |
2014.12.08. LBNL DAS Soil Sampling Report |
Tetra Tech |
2014 |
Report |
2007.04.05 Draft Current Conditions Report |
Tetra Tech; Sea Engineering, Inc |
2007 |
Report |
2011.03.25 Proposed Continued Groundwater Monitoring Locations |
Tetra Tech |
2011 |
Report |
2012.10. 25 Conservation of the Remnant Coastal Prairie at UC Berkeley's Richmond Field Station |
Alan Cai; Patrick Donnelly-Shores |
2012 |
Report |
2007.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2009.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2015.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2010.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2011.05.16 Year 5 Monitoring Report, Response to Comments |
UC Berkeley |
2011 |
Report |
2017.08.10 TSCA PCB Risk-based Disposal Application: Corporation Yard and B150 Transformer Area |
UC Berkeley |
2017 |
Report |
2012.08.10 Final Phase III Field Sampling Plan |
Tetra Tech |
2012 |
Report |
2018.07.31 Semi-Annual Groundwater and Surface Water Monitoring Report, January 1 through June 30, 2018 |
Terraphase |
2018 |
Report |
2020.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2022.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2005.07.08 Summary of PCB Results Richmond Field Station |
BBL |
2005 |
Report |
2008.07.11 Memorandum for a Time-Critical Removal Action at Two Campfire Locations in the Western Transition Area |
Tetra Tech |
2008 |
Report |
2012.02.01 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2009.01.26 Western Stege Marsh Restoration Project: Vegetation Monitoring Report - 2008 |
May & Associates, Inc |
2009 |
Report |
2012.09.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2009.07.10 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2015.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2012.01.20 Technical Memorandum for Well Closures |
Tetra Tech |
2012 |
Report |
2010.03.17 Final Release: Public Health Assessment Evaluation of Exposure to Contaminants at the University of California, Berkeley, Richmond Field Station (PHA) |
Department of Public Health |
2010 |
Report |
2012.09.10 Pilot Study Summary Report for the In Situ Treatment of Volatile Organic Compounds in Groundwater, 2011 Injections |
Arcadis |
2012 |
Report |
2021.08.19.RFS B277 Soil Sampling Summary Letter |
Tetra Tech |
2021 |
Report |
2018.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2018.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2019.06.10 NRLF Phase 4 Updated Sampling Report |
Tetra Tech |
2019 |
Report |
2012.12.11 Final Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum |
Tetra Tech |
2015 |
Report |
2009.05.26 Implementation Summary Report for a Time-Critical Removal Action at Two Subareas in the Western Transition Area |
Tetra Tech |
2009 |
Report |
2015.07.10 RFS Corporation Yard Removal Action Plans |
Tetra Tech |
2015 |
Report |
2011.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2013.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2009.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2016.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
1990.05.21 Removal Site Evaluation of Mercury in Soil and Groundwater at Former Mercury Fulminate Area |
Jonas & Associates Inc |
1990 |
Report |