2009.07.31 Tsunami Inundation Map for Emergency Planning with Berkeley Global Campus |
Contra Costa County |
2009 |
Figure |
Coastal Prairie Native and Rare Taxa |
The Watershed Project |
2007 |
Figure |
Stege Marsh Ridgway's Rails Presentation |
Office of Environment, Health & Safety |
2015 |
Presentation |
2008.01.16 Richmond Field Station Remediation and Restoration Project Town Hall |
UC Berkeley |
2008 |
Presentation |
2007.05 Control of Harding grass (Phalaris aquatica) at the Richmond Field Station |
Monica W Stafford; Liz Andrews; Stacy Haines |
2007 |
Presentation |
2013.12.05 Public Draft Removal Action Workplan Presentation |
UC Berkeley |
2013 |
Presentation |
2018.04.27 Western Stege Marsh and Meeker Slough, DTSC, RWQCB, and CoR Meeting |
UC Berkeley |
2018 |
Presentation |
2013.02.01 RFS Natural Areas Restoration: Western Stege Marsh, Coastal Terrace Prairie |
UC Berkeley |
2013 |
Presentation |
2006.06.20 Notice of Invasive Weed Mowing |
UC Berkeley |
2006 |
White Paper |
2016.06.17 Imported Soils Sampling and Analysis Requirements to Assess Contaminant Concentrations |
UC Berkeley |
2016 |
White Paper |
2019.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
1941.06.30 East Bay Cityies Sewage Disposal Survey Report Upon the Collection, Treatement, and Disposal of Sewage and Industrial Wastes of the East Bay Cities, California |
The Board of Consuliting Engineers |
1941 |
Report |
2017.01.09 Final 2016 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2017 |
Report |
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site |
Tetra Tech |
2014 |
Report |
2006.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2006 |
Report |
2012.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2009.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2016.05.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2011.03.11 Transmittal of Groundwater Data Collected in Select Areas at the University of California Richmond Field Station |
Arcadis |
2011 |
Report |
2018.02.13 2017 Groundwater Sampling Results Technical Memorandum, Response to Comments |
UC Berkeley |
2018 |
Report |
2018.10.25 Draft 2018 Groundwater Sampling Results Technical Memorandum, Response to Comments |
UC Berkeley |
2018 |
Report |
2020.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2023.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2019.05.06 Mercury Fulminate Area Pilot Excavation Summary |
Tetra Tech |
2019 |
Report |
2018.01.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2015.02.20 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site |
Tetra Tech |
2015 |
Report |
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC |
UC Berkeley |
2014 |
Report |
2010.04.15 Final Phase I Groundwater Sampling Field Sampling Workplan |
Tetra Tech |
2010 |
Report |
2010.02.26 Letter Work Plan for Step-Out Sampling Locations on the University Of California Richmond Field Station, MW-25 Pilot Test Area, Lots 1 and 2, Former Zeneca Facility |
LFR |
2010 |
Report |
2010.10 RFS Invasive Weeds Annual Calendar |
UC Berkeley |
2010 |
Report |
2007.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2008.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |
2014.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2010.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 2: Vegetation Monitoring Report |
May & Associates, Inc |
2010 |
Report |
2016.09.26 Draft 2016 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2016 |
Report |
2011.11.30 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary |
Terraphase |
2011 |
Report |
2002.11.06 Final Remedial Design Details - Addendum 2 Mercury Treatability Study Results |
URS |
2002 |
Report |
2013.04.17 Final Richmond Field Station Grassland Constraints Analysis |
Wildlife Research Associates; Jane Valerius Environmental Consulting |
2013 |
Report |
2012.01.20 Draft Phase II Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2022.06.06 Final 2021 RFS Groundwater Sampling Report |
Tetra Tech |
2022 |
Report |
2022.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2022 |
Report |
2017.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2007.05.16 Pyrite Cinder- containing Soils Management Procedures |
UC Berkeley |
2007 |
Report |
2006.01.18 Provisional Joint Health Statement Summary (Short) The Zeneca and UC Richmond Field Station Sites |
Contra Costa County Health Services Department; California Department of Health Services |
2006 |
Report |
2007.09.24 Draft RFS Public Health Assessment - UC Comments |
UC Berkeley |
2007 |
Report |
2011.08. 22 Final, Revision 1, Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2004.02.14 West Stege Marsh and Ecotone Revegetation Plan (2003-5) |
The Aquatic Outreach Institute |
2004 |
Report |
2007.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2009.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |