2010.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.08.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.09.30 Fifth Annual Monitoring Report East Stege Marsh |
Arcadis |
2010 |
Report |
2019.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2013.02.01 Final Technical Approach for Human Health Risk Assessment, Site Characterization Report, Proposed Richmond Bay Campus |
Tetra Tech |
2013 |
Report |
2004.08.24 PCBs in Upland AOC U1 |
BBL |
2004 |
Report |
2012.06.11 Final Phase II Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2022.06.06 Final RFS 5-Year Review Report |
UC Berkeley |
2022 |
Report |
2023.01.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2017.01.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2007.05.16 Pyrite Cinder- containing Soils Management Procedures Attachment |
UC Berkeley |
2007 |
Report |
2017.09.15 2017 Groundwater Sampling Results Technical Memorandum Response to Comments |
Tetra Tech |
2017 |
Report |
2006.09.14 Field Sampling Activities, Additional Sample Locations, UC Berkeley Richmond Field Station, Campus Bay, Former Zeneca Facility, Richmond, California |
LFR |
2006 |
Report |
2007.12.19 Response to Comments on Draft Current Conditions Report |
Tetra Tech |
2007 |
Report |
2011.08.31 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and the University of California Richmond Field Station Property Border |
Terraphase |
2011 |
Report |
2006.09.28 Fertility Recommendations for Richmond Field Station Wetland Restoration |
Tetra Tech |
2006 |
Report |
2012.07.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2009.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2015.08.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2011.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2016.02.05 Building 280A and Building 450 Soil Sampling Results |
Tetra Tech |
2016 |
Report |
2001.11.21 Final Results of Additional Soil and Groundwater Investigations and Groundwater Monitoring Plan, Upland Portion of Subunit 2A, Volume 1 of 2 |
URS |
2001 |
Report |
2021.07.01 Richmond Field Station Project: Botanical Survey Report |
Rana Creek Habitat Restoration |
2021 |
Report |
2023.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2023 |
Report |
2018.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2018 |
Report |
2018.07.02 NRLF Phase 4 Form B and Sampling Plan |
UC Berkeley; Tetra Tech |
2018 |
Report |
2017.01.05 Final Phase V Field Sampling Plan |
Tetra Tech |
2017 |
Report |
2014.10.06 Final Phase IV Field Sampling Plan |
Tetra Tech |
2014 |
Report |
2013.10.10 Final 2013 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2013 |
Report |
2006.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2006 |
Report |
2013.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2013 |
Report |
2014.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2016.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2019.01.31 2018 Campus Bay Annual Groundwater and Surface Water Monitoring Report Appendicies |
Terraphase |
2019 |
Report |
2015.06.01 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation |
UC Berkeley |
2015 |
Report |
2019.04.11 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2019 |
Report |
2012.03.06 Wetland Determination, Western Stege Marsh |
Tetra Tech |
2012 |
Report |
1991.02.22 Final Risk Assessment Report |
Jonas & Associates Inc |
1991 |
Report |
2006.10.31 Health and Safety Plan Addendum |
Tetra Tech |
2006 |
Report |
2021.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2021 |
Report |
2017.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2017 |
Report |
2005.06.16 Implementation Report Phase 3 Upland Portion of Subunit 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Task 4D, RWQCB Order No.01-102) |
URS |
2005 |
Report |
2013.03.01 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, February 4, 2013 Sampling Event |
Tetra Tech |
2013 |
Report |
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC |
Tetra Tech |
2014 |
Report |
2005.10.06 Draft Final Revised Removal Action Work Plan, Remaining Portions of East Stege Marsh to be Remediated, Campus Bay, Richmond, California |
LFR |
2005 |
Report |
2007.01 Best Management Practices for Disturbance of Soils Containing Pyrite Cinder Fill |
UC Berkeley |
2006 |
Report |
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix B, Health and Safety Plan |
Tetra Tech |
2010 |
Report |
1989.05 The Natural Areas of the University of California Richmond Field Station |
Joyce Gutstein |
1989 |
Report |
2007.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2007 |
Report |
2008.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2008 |
Report |