2020.01.24 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.23 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.23 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.22 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.22 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.21 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.21 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.20 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.20 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.18 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.18 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.17 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.17 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.16 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.16 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.15 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.15 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.14 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.14 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.14 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2020 |
Report |
2020.01.13 MFA Excavation Lumex Results |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.13 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.10 MFA Excavation Lumex Results |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.10 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.09 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.09 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.08 MFA Excavation PDR Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2020.01.08 MFA Excavation Lumex Data |
Tetra Tech |
2020 |
Air Monitoring Data |
2019.12.31 Final Soil Management Plan, Revision 2 |
Tetra Tech |
2019 |
Report |
2019.12.31 DRAFT Removal Action Workplan Research, Education, and Support Area and Groundwater Five-Year Review |
Tetra Tech |
2019 |
Report |
2019.12.30 Draft 2019 Groundwater Sampling Results Technical Memorandum, DTSC Approval Letter |
DTSC |
2019 |
Agency Letter |
2019.12.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2019.12.12 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2019 |
Report |
2019.12.03 Revised Sampling Approach for Bioretention Area |
UC Berkeley |
2019 |
Technical Letter |
2019.11.26 Notification of Piezometer MFA Abandonment and Installation |
Tetra Tech |
2019 |
Technical Letter |
2019.11.25 NRLF Summary Results DTSC No Comment Letter |
DTSC |
2019 |
Agency Letter |
2019.11.25 NRLF Bioretention Area Sampling Approach, DTSC Comment Letter |
DTSC |
2019 |
Agency Letter |
2019.11.22 Corporation Yard, Data Gap Sampling Results |
Tetra Tech |
2019 |
Technical Letter |
2019.11.21 NRLF Phase 4 Retention Area Form B and Sampling Approach |
UC Berkeley |
2019 |
Technical Letter |
2019.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2019.11.07 Draft 2019 Groundwater Sampling Results Technical Memorandum, Appendix E Transmittal Letter |
UC Berkeley |
2019 |
Transmittal Letter |
2019.11.07 Draft 2019 Groundwater Sampling Results Technical Memorandum, Appendix E |
Tetra Tech |
2019 |
Report |
2018.06.28 Phase IV EPA North Meadow, Supplementary PCB Sampling Results DTSC Approval Letter |
DTSC |
2019 |
Agency Letter |
2019.10.25 Draft Feasibility Study/Remedial Action Plan for Lot 1, Lot 2, and the Upland Portion of Lot 3 Approval Letter |
DTSC |
2019 |
Agency Letter |
2019.10.25 NRLF Phase 4 - Retention Area Form A |
UC Berkeley |
2019 |
Technical Letter |
2019.10.24 Mercury Fulminate Area Excavation Plan |
Tetra Tech |
2019 |
Figure |
2019.10.21 Mercury Fulminate Area Excavation Update Summary |
Tetra Tech |
2019 |
Technical Letter |
2019.10.14 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |
2019.09.23 Draft 2019 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2019 |
Agency Letter |
2019.09.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2019 |
Report |