2014.12.08 GSU Report of Completion of a Magnetometer Survey at the UC Richmond Field Station |
Geological Services Unit |
2014 |
Report |
2014.12.08. LBNL DAS Soil Sampling Report |
Tetra Tech |
2014 |
Report |
2014.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2015.01.15 Response to Comments for "Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier" DTSC Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.01.26 BCDC Permit Revision Number 3 |
BCDC |
2015 |
Orders & Permits |
2015.01.26 BCDC Permit Revision Number 3 Cover Letter |
BCDC |
2015 |
Transmittal Letter |
2015.02.02 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2014, Campus Bay |
Terraphase |
2015 |
Report |
2015.02.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.02.20 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site |
Tetra Tech |
2015 |
Report |
2015.03.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.06.01 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation |
UC Berkeley |
2015 |
Report |
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum, Transmittal Letter |
Tetra Tech |
2015 |
Transmittal Letter |
2015.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.06.26 RFS Corporation Yard Removal Action Specifications |
Tetra Tech |
2015 |
Report |
2015.07.09 2014 Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.07.10 RFS Corporation Yard Removal Action Plans |
Tetra Tech |
2015 |
Report |
2015.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Transmittal Letter |
2015.08.07 Draft Phase IV Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2015 |
Agency Letter |
2015.08.12 Removal Action Workplan, Corporatin Yard Soil Removal Action Final Construction Drawings and Specifications Transmittal Letter |
UC Berkeley |
2015 |
Transmittal Letter |
2015.08.13 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2015 |
Report |
2015.08.14 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation, Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.08.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.09.25 Draft 2015 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2015 |
Agency Letter |
2015.10.06 Phase IV, EPA Meadow North, Supplementary PCB Sampling Results |
Tetra Tech |
2015 |
Report |
2015.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.10.19 Final 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.11.03 Revised 2015 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.11.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.12.11 Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.12.29 FINAL Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum DTSC Approval Letter |
DTSC |
2015 |
Agency Letter |
2016.01.14 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.02.05 Building 280A and Building 450 Soil Sampling Results |
Tetra Tech |
2016 |
Report |
2016.02.11 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.02.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.03.10 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.03.17 Building 280A and Building 450 Soil Sampling Results, Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.03.21 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |
2016.03.24 B163PHYTOREM Forms and B including sampling results and Work Plan |
UC Berkeley |
2016 |
Report |
2016.03.28 Proposed Continued Groundwater Monitoring Locations for 2016 DTSC Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.03.30 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |