2010.05.26 Final Phase I Groundwater Sampling Field Sampling Workplan; Appendix A, Quality Assurance Project Plan, and Appendix B, Health and Safety Plan, Approval Letter |
DTSC |
2010 |
Agency Letter |
2010.05.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.04.15 Final Field Sampling Workplan Appendix B, Health and Safety Plan |
Tetra Tech |
2010 |
Report |
2010.04.15 Final Phase I Groundwater Sampling Field Sampling Workplan |
Tetra Tech |
2010 |
Report |
2010.04.15 Final Field Sampling Workplan: Appendix A, Quality Assurance Project Plan |
Tetra Tech |
2010 |
Report |
2010.03.17 Final Release: Public Health Assessment Evaluation of Exposure to Contaminants at the University of California, Berkeley, Richmond Field Station (PHA) |
Department of Public Health |
2010 |
Report |
2010.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.02.26 Letter Work Plan for Step-Out Sampling Locations on the University Of California Richmond Field Station, MW-25 Pilot Test Area, Lots 1 and 2, Former Zeneca Facility |
LFR |
2010 |
Report |
2010.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2009.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.12.07 Results of Evaluation of Pre-Construction Conditions in Soil Meade By-Pass Roadway, Richmond, California, Approval Letter |
DTSC |
2009 |
Agency Letter |
2009.11.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.11.02 Results of Evaluation of Pre-Construction Conditions in Soil, Meade By-pass Roadway |
PES Environmental, Inc |
2009 |
Report |
2009.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.09.14 Response to Comments from DTSC for the Second Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2 |
LFR |
2009 |
Report |
2009.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.08.12 Year 4 Monitoring Report for the Western Stege Marsh Restoration Project |
Tetra Tech |
2009 |
Report |
2009.07.31 Tsunami Inundation Map for Emergency Planning with Berkeley Global Campus |
Contra Costa County |
2009 |
Figure |
2009.07.10 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.06.22 Workplan for Evaluation of Pre-Construction Conditions in Soil, Meade By-pass Roadway |
PES Environmental, Inc |
2009 |
Report |
2009.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.06.04 RFS Weeds Worker Training Manual |
UC Berkeley |
2009 |
Report |
2009.06.01 DTSC Risk Assesssment for Coastal Cleanup Volunteer in the Meeker Slough Area |
DTSC |
2009 |
Agency Letter |
2009.05.29 Implementation Summary Report for a Time-Critical Removal Action at Two Subareas in the Western Transition Area Approval Letter |
DTSC |
2009 |
Agency Letter |
2009.05.26 Sampling Results for Stormwater within the Western Stege Marsh |
Tetra Tech |
2009 |
Report |
2009.05.26 Implementation Summary Report for a Time-Critical Removal Action at Two Subareas in the Western Transition Area |
Tetra Tech |
2009 |
Report |
2009.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.04.23 Implementation Summary Report for a Time-Critical Removal Action at Two Campfire Locations in the Western Transition Area, Comment Letter |
DTSC |
2009 |
Agency Letter |
2009.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.04.15 Field Sampling Workplan, Appendix A and Appendix B, DTSC comment Letter |
DTSC |
2009 |
Agency Letter |
2009.04 CAG Minutes |
|
2009 |
Minutes |
2009.03.19 Year 3 Monitoring Report for the Western Stege Marsh Restoration Project |
Tetra Tech |
2009 |
Report |
2009.03.16 Public Health Assessment Evaluation of Exposure to Contaminants from the Zeneca/Campus Bay Site (PHA) |
Department of Public Health |
2009 |
Report |
2009.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.03 CAG Minutes |
|
2009 |
Minutes |
2009.02.27 Draft Field Sampling Workplan |
Tetra Tech |
2009 |
Report |
2009.02.27 Draft Field Sampling Workplan Cover Letter |
UC Berkeley |
2009 |
Transmittal Letter |
2009.02.27 Draft Field Sampling Workplan: Appendix A, Quality Assurance Project Plan |
Tetra Tech |
2009 |
Report |
2009.02.27 Draft Field Sampling Workplan Appendix B, Health and Safety Plan |
Tetra Tech |
2009 |
Report |
2009.02.23 Implementation Summary Report for a Time- Critical Removal Action at Two Campfire Locations in the Western Transition Area |
Tetra Tech |
2009 |
Report |
2009.02.23 Agreement for Permitting of Drilling Activities |
City of Berkeley |
2009 |
Agency Letter |
2009.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.02 CAG Minutes |
|
2009 |
Minutes |
2009.01.26 Western Stege Marsh Restoration Project: Vegetation Monitoring Report - 2008 |
May & Associates, Inc |
2009 |
Report |
2009.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2009 |
Report |
2009.01 CAG Minutes |
|
2009 |
Minutes |
2008.12 Habitat Restoration Progress Report Appendices |
The Watershed Project |
2008 |
Report |