2012.11.21 Sampling Results for Soil Samples Collected for the Building 445 Landscaping Project |
Tetra Tech |
2012 |
Report |
2012.11.16 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Response to Comments |
Terraphase |
2012 |
Report |
2012.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.10. 25 Conservation of the Remnant Coastal Prairie at UC Berkeley's Richmond Field Station |
Alan Cai; Patrick Donnelly-Shores |
2012 |
Report |
2012.10.23 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.10.04 Revised TCE Risk Evaluation, DTSC Approval |
DTSC |
2012 |
Agency Letter |
2012.09.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.09.10 Pilot Study Summary Report for the In Situ Treatment of Volatile Organic Compounds in Groundwater, 2011 Injections |
Arcadis |
2012 |
Report |
2012.09.05 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.08.10 Final Phase III Field Sampling Plan |
Tetra Tech |
2012 |
Report |
2012.08.03 Phase III Field Sampling Plan, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.07.19 Revised TCE Risk Evaluation, Response to Comments |
Terraphase |
2012 |
Report |
2012.07.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.07.05 Technical Memorandum for Well Closures, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.06.22 Phase III Field Sampling Plan, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.06.11 Final Phase II Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.06.11 Technical Memorandum for Well Closures |
Tetra Tech |
2012 |
Report |
2012.06.01 Phase II Sampling Results Technical Memorandum, RTC Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.05.21 Phase III Field Sampling Plan, Response to Comments |
UC Berkeley |
2012 |
Report |
2012.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.04.26 Phase II Sampling Results Technical Memorandum, Draft Response to Comments |
UC Berkeley |
2012 |
Report |
2012.04.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.03.23 Technical Memorandum for Well Closures, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.03.20 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.03.16 Proposed Continued Groundwater Monitoring, April 2012 |
Tetra Tech |
2012 |
Report |
2012.03.15 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.03.14 Phase II Sampling Results Technical Memorandum, DTSC Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.03.08 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Response to Comments |
Terraphase |
2012 |
Report |
2012.03.06 Wetland Determination, Western Stege Marsh |
Tetra Tech |
2012 |
Report |
2012.02.29 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.02.22 Field Sampling Work Plan to conduct additional groundwater investigation within and in the vicinity of the BAPB at the University of California Richmond Field Station, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.02.10 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2012 |
Agency Letter |
2012.02.07 Draft Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.02.01 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB at the University of California Berkeley Richmond Field Station |
Arcadis |
2012 |
Report |
2012.02.01 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.01.20 Draft Phase II Sampling Results Technical Memorandum |
Tetra Tech |
2012 |
Report |
2012.01.20 Technical Memorandum for Well Closures |
Tetra Tech |
2012 |
Report |
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter |
DTSC |
2012 |
Agency Letter |
2012.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2012 |
Report |
2012.01.11 Phase I, April 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter |
DTSC |
2012 |
Agency Letter |
2011.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.12.09 Final Phase I April 2011 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2011.12.02 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results, Comment Letter |
DTSC |
2011 |
Agency Letter |
2011.11.30 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary |
Terraphase |
2011 |
Report |
2011.11.18 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results |
Terraphase |
2011 |
Report |