Publications

Title Author Year Publication type
2012.11.21 Sampling Results for Soil Samples Collected for the Building 445 Landscaping Project Tetra Tech 2012 Report
2012.11.16 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Response to Comments Terraphase 2012 Report
2012.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.10. 25 Conservation of the Remnant Coastal Prairie at UC Berkeley's Richmond Field Station Alan Cai; Patrick Donnelly-Shores 2012 Report
2012.10.23 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2012.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.10.04 Revised TCE Risk Evaluation, DTSC Approval DTSC 2012 Agency Letter
2012.09.17 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.09.10 Pilot Study Summary Report for the In Situ Treatment of Volatile Organic Compounds in Groundwater, 2011 Injections Arcadis 2012 Report
2012.09.05 Draft Phase I November 2010 through April 2012 Groundwater Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.08.10 Final Phase III Field Sampling Plan Tetra Tech 2012 Report
2012.08.03 Phase III Field Sampling Plan, Approval Letter DTSC 2012 Agency Letter
2012.07.19 Revised TCE Risk Evaluation, Response to Comments Terraphase 2012 Report
2012.07.16 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.07.05 Technical Memorandum for Well Closures, Approval Letter DTSC 2012 Agency Letter
2012.06.22 Phase III Field Sampling Plan, Comment Letter DTSC 2012 Agency Letter
2012.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.06.11 Final Phase II Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.06.11 Technical Memorandum for Well Closures Tetra Tech 2012 Report
2012.06.01 Phase II Sampling Results Technical Memorandum, RTC Approval Letter DTSC 2012 Agency Letter
2012.05.21 Phase III Field Sampling Plan, Response to Comments UC Berkeley 2012 Report
2012.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.04.26 Phase II Sampling Results Technical Memorandum, Draft Response to Comments UC Berkeley 2012 Report
2012.04.16 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.03.23 Technical Memorandum for Well Closures, Comment Letter DTSC 2012 Agency Letter
2012.03.20 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Approval Letter DTSC 2012 Agency Letter
2012.03.16 Proposed Continued Groundwater Monitoring, April 2012 Tetra Tech 2012 Report
2012.03.15 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2012 Agency Letter
2012.03.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.03.14 Phase II Sampling Results Technical Memorandum, DTSC Comment Letter DTSC 2012 Agency Letter
2012.03.08 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Response to Comments Terraphase 2012 Report
2012.03.06 Wetland Determination, Western Stege Marsh Tetra Tech 2012 Report
2012.02.29 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.02.22 Field Sampling Work Plan to conduct additional groundwater investigation within and in the vicinity of the BAPB at the University of California Richmond Field Station, Comment Letter DTSC 2012 Agency Letter
2012.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.02.10 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2012 Agency Letter
2012.02.07 Draft Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2012.02.01 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB at the University of California Berkeley Richmond Field Station Arcadis 2012 Report
2012.02.01 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.01.20 Draft Phase II Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.01.20 Technical Memorandum for Well Closures Tetra Tech 2012 Report
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter DTSC 2012 Agency Letter
2012.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.01.11 Phase I, April 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2011.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.12.09 Final Phase I April 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2011.12.02 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results, Comment Letter DTSC 2011 Agency Letter
2011.11.30 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary Terraphase 2011 Report
2011.11.18 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results Terraphase 2011 Report