Publications

Title Author Year Publication type
2015.08.12 Removal Action Workplan, Corporatin Yard Soil Removal Action Final Construction Drawings and Specifications Transmittal Letter UC Berkeley 2015 Transmittal Letter
2015.08.07 Draft Phase IV Sampling Results Technical Memorandum DTSC Comment Letter DTSC 2015 Agency Letter
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum Tetra Tech 2015 Report
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum Tetra Tech 2015 Transmittal Letter
2015.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2015.07.10 RFS Corporation Yard Removal Action Plans Tetra Tech 2015 Report
2015.07.09 2014 Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, Approval Letter DTSC 2015 Agency Letter
2015.06.26 RFS Corporation Yard Removal Action Specifications Tetra Tech 2015 Report
2015.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum, Transmittal Letter Tetra Tech 2015 Transmittal Letter
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum Tetra Tech 2015 Report
2015.06.01 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation UC Berkeley 2015 Report
2015.05.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2015.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2015.03.17 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2015.02.20 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site Tetra Tech 2015 Report
2015.02.17 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2015.02.02 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2014, Campus Bay Terraphase 2015 Report
2015.01.26 BCDC Permit Revision Number 3 BCDC 2015 Orders & Permits
2015.01.26 BCDC Permit Revision Number 3 Cover Letter BCDC 2015 Transmittal Letter
2015.01.15 Response to Comments for "Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier" DTSC Approval Letter DTSC 2015 Agency Letter
2015.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2015 Report
2014.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.12.08 GSU Report of Completion of a Magnetometer Survey at the UC Richmond Field Station Geological Services Unit 2014 Report
2014.12.08. LBNL DAS Soil Sampling Report Tetra Tech 2014 Report
2014.12.01 LBNL SEISMIC Form B UC Berkeley 2014 Report
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum Tetra Tech 2014 Report
2018.11.18 Draft 2014 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2014 Agency Letter
2014.11.17 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.11.13 LBNL SEISMIC DTSC approval DTSC 2014 Agency Letter
2014.11.13 Final Pre-Design Investigation Report for Habitat Area 2, Campus Bay Site Arcadis 2014 Report
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC Tetra Tech 2014 Report
2014.11.03 PEERfootings Form A and July 18, 2014 Soil Sampling Letter to DTSC UC Berkeley; Tetra Tech 2014 Report
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter DTSC 2014 Agency Letter
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC UC Berkeley 2014 Report
2014.10.29 Bulb Exploratory Excavation Upwind Personal Data Real-time Aerosol Monitor UC Berkeley 2014 Air Monitoring Data
2014.10.29 Bulb Exploratory Excavation Downwind Personal Data Real-time Aerosol Monitor UC Berkeley 2014 Air Monitoring Data
2014.10.28 Final Phase IV Field Sampling Plan Addendum 1 Tetra Tech 2014 Report
2014.10.24 LBNL SEISMIC Form A UC Berkeley 2014 Report
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter DTSC 2014 Agency Letter
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter DTSC 2014 Agency Letter
2014.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.10.10 Building 280A and Building 450 Soil Sampling UC Berkeley 2014 Report
2014.10.08 PEERpipevalve Form A UC Berkeley; Tetra Tech 2014 Report
2014.10.06 Final Phase IV Field Sampling Plan Tetra Tech 2014 Report
2014.09.25 Draft Phase IV Field Sampling Plan, Comment Letter DTSC 2014 Agency Letter
2014.09.19 Response to Department of Toxic Substances Control Comments Regarding the “Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, University of California, Richmond F Terraphase 2014 Report
2014.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2014 Report
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site Tetra Tech 2014 Report