2005.12.08 Revised Technical Specifications for Well Destructions |
Stellar Environmental Solutions |
2005 |
Report |
2005.11.30 Soil Vapor Study Results for Building 240 at the Zeneca/former Stauffer Chemical Site |
DTSC |
2005 |
Report |
2005.10.19 Tetnative Order Rescission of Order No. 01-102 Site Cleanup Requirements for: University of California Berkeley, Zeneca Inc, University of California Richmond Field Station, Meade Street Operable Unit, Subunit 2 |
San Francisco Regional Water Quality Control Board |
2005 |
Orders & Permits |
2005.10.19 Staff Summary Report Zeneca Inc. and University of California Berkeley, Meade Street Operable Unit Subunit 2 - Rescission of Site Cleanup Requirements Order No. 01-102 |
San Francisco Regional Water Quality Control Board |
2005 |
Report |
2005.10.06 Draft Final Revised Removal Action Work Plan, Remaining Portions of East Stege Marsh to be Remediated, Campus Bay, Richmond, California |
LFR |
2005 |
Report |
2005.09.29 DTSC letter |
DTSC |
2005 |
Agency Letter |
2005.08.29 Western Stege Marsh Restoration Project Year 1 Monitoring Report |
BBL |
2005 |
Report |
2005.08.19 Purple Ooze Letter Report |
DTSC |
2005 |
Agency Letter |
2005.08 Tentative Orders for Zeneca, Inc. and University of California Berkeley Richmond Field Station sites, Richmond, Contra Costa County |
San Francisco Regional Water Quality Control Board |
2005 |
Agency Letter |
2005.07.08 Summary of PCB Results Richmond Field Station |
BBL |
2005 |
Report |
2005.07 Tentative Order Rescission of Order No. 01-101 Site Cleanup Requirement for: Zeneca Inc., 1415 South 47th Street, Richmond, Contra Costa County, Meade Street Operable Unit Subunit 1 |
San Francisco Regional Water Quality Control Board |
2005 |
Orders & Permits |
2005.07 Tentative Order Rescission of Order No. 01-102 Site Cleanup Requirement for: University of California Richmond Field Station, 1301 South 46th Street, Richmond, Contra Costa County, Meade Street Operable Unit Subunit 2 |
San Francisco Regional Water Quality Control Board |
2005 |
Orders & Permits |
2005.06.16 Implementation Report Phase 3 Upland Portion of Subunit 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Task 4D, RWQCB Order No.01-102) |
URS |
2005 |
Report |
2005.06.03 Draft Conceptual Remedial Action Plan - Addendum |
BBL |
2005 |
Report |
2005.06.03 Draft Conceptual RAP Addendum, Appendix A: Boring Logs |
BBL |
2005 |
Report |
2005.02.28 UC Richmond Field Station's Remnant Coastal Terrace Prairie |
David Amme |
2005 |
Article |
2004.12.03 Implementation Report Phase 2 – Subunit 2A & 2B Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Tasks 2E, 3E and 5D, RWQCB Order No.01-102) |
URS |
2004 |
Report |
2004.12.03 Groundwater, Surface Water, and Sediment Monitoring Plan, Subunit 2, Meade Street Operable Unit |
BBL |
2004 |
Report |
2004.11.22 Status Report on Polychlorinated Biphenyls in the Western Storm Drain |
UC Berkeley |
2004 |
Report |
2004.09.29 RFS Remediation Project, Phase 3 Monitoring and Notification, MSOU Subunit 2B, Richmond Field Station, Richmond CA |
URS |
2004 |
Report |
2004.08.24 PCBs in Upland AOC U1 |
BBL |
2004 |
Report |
2004.08 Western Stege Marsh Restoration Project Monitoring Plan |
BBL |
2004 |
Report |
2004.07.13 Remedial Action Plan - Phase 3 |
BBL |
2004 |
Report |
2004.06.18 Bay Conservation and Development Commission Permit No. M01-52(b) Amendment No. Two Extension |
BCDC |
2004 |
Orders & Permits |
2004.04.26 Covenant and Environmental Restriction on Property, Campus Bay Site |
RWQCB |
2004 |
Orders & Permits |
2004.02.14 West Stege Marsh Upland Revegetation Plan (2003-5) |
The Aquatic Outreach Institute |
2004 |
Report |
2004.02.14 West Stege Marsh and Ecotone Revegetation Plan (2003-5) |
The Aquatic Outreach Institute |
2004 |
Report |
2004.01.30 Invasive/Exotic Vegetation Management Plan |
BBL |
2004 |
Report |
2004.01 Feral Animal Management Program |
BBL |
2003 |
Report |
2003.11.05 Fighting Invasives, one root ball at a time |
Cathy Cockrell |
2003 |
Article |
2001.10.31 Final Report Results of Additional Soil and Groundwater Investigation |
URS |
2003 |
Report |
2003.10.20 Supplemental Mercury Treatability Study |
URS |
2003 |
Report |
2003.10.17 Bay Conservation and Development Commission Permit No. M01-52(b) Amendment No. One |
BCDC |
2003 |
Orders & Permits |
2003.09.04 Implementation Report, Phase 1, Subunit 2A Meade Street Operable Unit, University of California Berkeley, Richmond Field Station, Richmond California (Tasks 2E and 3E, RWQCB Order No.01-102) |
URS |
2003 |
Report |
2003.09.04 Department of the Army, Corps of Engineers, File Number 28135S- Western Stege Marsh Remediation and Restoration (Army Nationwide Permit 38 Authorization) |
USACE |
2003 |
Orders & Permits |
2003.07.25 Richmond Field Station Remediation Project Biological Assessment Report |
BBL |
2003 |
Report |
2003.07.25 Biological Assessment Cover Letter |
BBL |
2003 |
Transmittal Letter |
2003.07.24 Additional Information Requested to Complete Revision to Permit No. M01-51 for the UC Berkeley RFS Remediation Project at Stege Marsh |
BBL |
2003 |
Orders & Permits |
2003.07.16 Project and Environmental Approval for the Richmond Field Station Remediation Project |
UC Berkeley |
2003 |
Transmittal Letter |
2003.07.16 Project and Environmental Approval for the Richmond Field Station Remediation Project Figure |
UC Berkeley |
2003 |
Figure |
2003.06.27 Nationwide Permit 38 Modification Request (ACOE File No. 25417S) Summary Letter to USACE and USFWS |
BBL |
2003 |
Orders & Permits |
2003.06.24 Nationwide Permit 38 Modification Request (ACOE File No. 25417S) Western Stege Marsh Remediation and Restoration Project at Richmond Field Station US Army Corpos of Engineers, Regulatory Branch |
BBL |
2003 |
Orders & Permits |
2003.06.23 Revision to Permit No. M01-52 Western Stege Marsh Remediation and Restortation Project, Richmond, California San Francisco Bay Conservation and Development Commission |
BBL |
2003 |
Orders & Permits |
2003.05.28 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act Text, Table and Appendices |
URS |
2003 |
Report |
2003.05.28 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act Figures |
URS |
2003 |
Report |
2003.05.28 Richmond Field Station Remediation Project Initial Study California Environmental Quality Act List of Prepares |
URS |
2003 |
Report |
2003.04.15 Final Remedial Action Plan - Phase 2 |
URS |
2003 |
Report |
2003.04.15 Phase 2 Remedial Action Plan, Table 2 |
URS |
2003 |
Figure |
2009.03.19 Year 3 Monitoring Report for the Western Stege Marsh Restoration Project Cover Letter |
UC Berkeley |
2003 |
Transmittal Letter |
2002.12.17 Final Conceptual Remedial Action Plan |
BBL |
2002 |
Report |