2011.11.16 Final, Revision I, Phase I Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2011 |
Agency Letter |
2011.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.10.05 Final Phase II Field Sampling Plan (SAP), DTSC Approval Letter |
DTSC |
2011 |
Agency Letter |
2011.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.09.12 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and the University of California Richmond Field Station Property Border Approval Letter |
DTSC |
2011 |
Agency Letter |
2011.09.12 Final Phase II Field Sampling Plan |
Tetra Tech |
2011 |
Report |
2011.09.12 Final Technical Memorandum for Well Destructions, Approval Letter |
DTSC |
2011 |
Agency Letter |
2011.08.31 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and the University of California Richmond Field Station Property Border |
Terraphase |
2011 |
Report |
2011.08. 22 Final, Revision 1, Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2011.08.19 Technical Memorandum for Well Destruction, Draft Response to Comments |
UC Berkeley |
2011 |
Report |
2011.08.19 Response to DTSC Comments on the Technical Memorandum for Well Destructions |
Tetra Tech |
2011 |
Report |
2011.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.07.27 Year 5 Monitoring Report DTSC Concurrence Letter of May 16, 2011 Response to Comments |
DTSC |
2011 |
Agency Letter |
2011.07.21 Final Phase 1 Groundwater Sampling Results Technical Memorandum, Comment Letter |
DTSC |
2011 |
Agency Letter |
2011.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.05.16 Year 5 Monitoring Report, Response to Comments |
UC Berkeley |
2011 |
Report |
2011.05.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.05.11 Final Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2011.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.03.29 Proposed Continued Groundwater Monitoring Locations DTSC Approval Letter |
DTSC |
2011 |
Agency Letter |
2011.03.25 Proposed Continued Groundwater Monitoring Locations |
Tetra Tech |
2011 |
Report |
2011.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.03.11 Transmittal of Groundwater Data Collected in Select Areas at the University of California Richmond Field Station |
Arcadis |
2011 |
Report |
2011.03.08 Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility Approval Letter |
DTSC |
2011 |
Agency Letter |
2011.02.25 Response to Department of Toxic Substances Control’s Comments on the “Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility |
Arcadis |
2011 |
Report |
2011.02.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2011 |
Report |
2011.01.12 Draft Phase I Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2011 |
Report |
2007.01 CAG Minutes |
|
2011 |
Minutes |
2010.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.11.24 Letter Work Plan to Evaluate Groundwater in Select Areas at the University of California Richmond Field Station, Response to Comments |
Arcadis |
2010 |
Report |
2010.11.19 Year 5 Monitoring Report, DTSC Comments |
DTSC |
2010 |
Agency Letter |
2010.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project |
Tetra Tech |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 1: Year 5 Hydrologic Monitoring Report |
Kamman Hydrology & Engineering, Inc |
2010 |
Report |
2010.10 RFS Invasive Weeds Annual Calendar |
UC Berkeley |
2010 |
Report |
2010.09.30 Year 5 Monitoring Report for the Western Stege Marsh Restoration Project, Attachment 2: Vegetation Monitoring Report |
May & Associates, Inc |
2010 |
Report |
2010.09.30 Fifth Annual Monitoring Report East Stege Marsh |
Arcadis |
2010 |
Report |
2010.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.08.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2010 |
Report |
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan |
Tetra Tech |
2010 |
Report |
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix B, Health and Safety Plan |
Tetra Tech |
2010 |
Report |
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Appendix A, Quality Assurance Project Plan |
Tetra Tech |
2010 |
Report |
2010.06.02 Final Phase I Groundwater Sampling Field Sampling Workplan, Figure 7 Groundwater Sampling Locations |
Tetra Tech |
2010 |
Figure |
2010.06 Appendix A: Historical Maps and Imagery Western Stege Marsh Restoration Project Site |
Kamman Hydrology & Engineering, Inc |
2010 |
Figure |