2011.01.12 Draft Phase I Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2011.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.02.25 Response to Department of Toxic Substances Control’s Comments on the “Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility Arcadis 2011 Report
2011.03.08 Third Addendum to the Treatability and Pilot Study Work Plan for Localized Occurrences of Volatile Organic Compounds in Groundwater, Lots 1 and 2, Former Zeneca Facility Approval Letter DTSC 2011 Agency Letter
2011.03.11 Transmittal of Groundwater Data Collected in Select Areas at the University of California Richmond Field Station Arcadis 2011 Report
2011.03.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.03.25 Proposed Continued Groundwater Monitoring Locations Tetra Tech 2011 Report
2011.03.29 Proposed Continued Groundwater Monitoring Locations DTSC Approval Letter DTSC 2011 Agency Letter
2011.04.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.05.11 Final Phase I Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2011.05.16 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.05.16 Year 5 Monitoring Report, Response to Comments UC Berkeley 2011 Report
2011.06.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.07.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.07.21 Final Phase 1 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2011 Agency Letter
2011.07.27 Year 5 Monitoring Report DTSC Concurrence Letter of May 16, 2011 Response to Comments DTSC 2011 Agency Letter
2011.08.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.08.19 Technical Memorandum for Well Destruction, Draft Response to Comments UC Berkeley 2011 Report
2011.08.19 Response to DTSC Comments on the Technical Memorandum for Well Destructions Tetra Tech 2011 Report
2011.08. 22 Final, Revision 1, Phase I Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2011.08.31 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and the University of California Richmond Field Station Property Border Terraphase 2011 Report
2011.09.12 Soil Gas Investigation Work Plan Describing Sampling Along the Campus Bay and the University of California Richmond Field Station Property Border Approval Letter DTSC 2011 Agency Letter
2011.09.12 Final Phase II Field Sampling Plan Tetra Tech 2011 Report
2011.09.12 Final Technical Memorandum for Well Destructions, Approval Letter DTSC 2011 Agency Letter
2011.09.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.10.05 Final Phase II Field Sampling Plan (SAP), DTSC Approval Letter DTSC 2011 Agency Letter
2011.10.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.11.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2011.11.16 Final, Revision I, Phase I Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2011 Agency Letter
2011.11.18 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results Terraphase 2011 Report
2011.11.30 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary Terraphase 2011 Report
2011.12.02 Technical Memorandum: University of California Richmond Field Station Biologically Active Permeable Barrier Groundwater Sampling Results, Comment Letter DTSC 2011 Agency Letter
2011.12.09 Final Phase I April 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2011 Report
2011.12.15 Richmond Field Station Monthly Summary Report UC Berkeley 2011 Report
2012.01.11 Phase I, April 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2012.01.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.01.19 Soil Gas Sampling Results, Campus Bay and University of California Richmond Field Station Property Boundary, Comment Letter DTSC 2012 Agency Letter
2012.01.20 Draft Phase II Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.01.20 Technical Memorandum for Well Closures Tetra Tech 2012 Report
2012.02.01 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB at the University of California Berkeley Richmond Field Station Arcadis 2012 Report
2012.02.01 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.02.07 Draft Phase I October 2011 Groundwater Sampling Results Technical Memorandum, Comment Letter DTSC 2012 Agency Letter
2012.02.10 Final, Revision 1 Phase I April 2011 Groundwater Sampling Results Technical Memorandum, Approval Letter DTSC 2012 Agency Letter
2012.02.15 Richmond Field Station Monthly Summary Report UC Berkeley 2012 Report
2012.02.22 Field Sampling Work Plan to conduct additional groundwater investigation within and in the vicinity of the BAPB at the University of California Richmond Field Station, Comment Letter DTSC 2012 Agency Letter
2012.02.29 Final Phase I October 2011 Groundwater Sampling Results Technical Memorandum Tetra Tech 2012 Report
2012.03.06 Wetland Determination, Western Stege Marsh Tetra Tech 2012 Report
2012.03.08 Field Sampling Work Plan to conduct additional groundwater investigations within and in the vicinity of the BAPB, Response to Comments Terraphase 2012 Report
2012.03.14 Phase II Sampling Results Technical Memorandum, DTSC Comment Letter DTSC 2012 Agency Letter