2016.11.16 DTSC Approval Letter of Revised Schedule |
DTSC |
2016 |
Agency Letter |
2016.11.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.10.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.09.27 Draft Soil Management Plan, Revision 1 Transmittal Letter |
Tetra Tech |
2016 |
Transmittal Letter |
2016.09.27 Draft Soil Management Plan, Revision 1 |
Tetra Tech |
2016 |
Report |
2016.09.26 Draft 2016 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2016 |
Report |
2016.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.12.09 Draft Phase V Field Sampling Plan DTSC Comment Letter |
DTSC |
2016 |
Agency Letter |
2016.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.07.18 Draft Phase V Field Sampling Plan |
Tetra Tech |
2016 |
Report |
2016.07.15 Draft Phase V Field Sampling Plan, Transmittal Letter |
Tetra Tech |
2016 |
Transmittal Letter |
2016.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.06.17 Imported Soils Sampling and Analysis Requirements to Assess Contaminant Concentrations |
UC Berkeley |
2016 |
White Paper |
2016.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.06.03 TSRCB445 Forms A and B for kiosk installation |
UC Berkeley |
2016 |
Report |
2016.05.16 Final Phase IV Sampling Results Technical Memorandum (no appendices) |
Tetra Tech |
2016 |
Report |
2016.05.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.05.16 Final Phase IV Sampling Results Technical Memorandum |
Tetra Tech |
2016 |
Report |
2016.05.12 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.04.22 DTSC Comment Letter on Phase IV Sampling Results Technical Memorandum |
DTSC |
2016 |
Agency Letter |
2016.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.04.14 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.03.24 B163PHYTOREM Forms and B including sampling results and Work Plan |
UC Berkeley |
2016 |
Report |
2016.03.30 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |
2016.03.28 Proposed Continued Groundwater Monitoring Locations for 2016 DTSC Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.03.21 Proposed Continued Groundwater Monitoring Locations for 2016 |
Tetra Tech |
2016 |
Report |
2016.03.17 Building 280A and Building 450 Soil Sampling Results, Approval Letter |
DTSC |
2016 |
Agency Letter |
2016.03.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.03.10 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.02.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.02.11 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2016.02.05 Building 280A and Building 450 Soil Sampling Results |
Tetra Tech |
2016 |
Report |
Job Safety Analysis - Tidal Marsh Planting, Weeding, Sampling, Marine Debris Removal, etc. |
Office of Environment, Health & Safety |
2016 |
Job Safety Analysis |
2016.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2016 |
Report |
2016.01.14 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2016 |
Report |
2015.12.29 FINAL Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum DTSC Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.12.11 Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum |
Tetra Tech |
2015 |
Report |
2012.12.11 Final Ambient Metals Evaluation Aluminum, Cobalt, Manganese, and Nickel Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.11.16 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.11.03 Revised 2015 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.10.19 Final 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.10.06 Phase IV, EPA Meadow North, Supplementary PCB Sampling Results |
Tetra Tech |
2015 |
Report |
2015.09.25 Draft 2015 Groundwater Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2015 |
Agency Letter |
2015.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
Stege Marsh Ridgway's Rails Presentation |
Office of Environment, Health & Safety |
2015 |
Presentation |
2015.08.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.08.14 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation, Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.08.13 DTSC Update Richmond Southeast Shoreline Sites |
DTSC |
2015 |
Report |